My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-01-27_HYDROLOGY - C1981010
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C1981010
>
2015-01-27_HYDROLOGY - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:56:55 PM
Creation date
1/27/2015 10:00:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Hydrology
Doc Date
1/27/2015
Doc Name
4th Quarter 2014 DMRS (CO-0032115)
From
Trappe Mning Inc
To
DRMS
Permit Index Doc Type
DMR’s
Email Name
JLE
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Observations of the discharge on January 6th appeared clear, no discharge could be discerned from the <br />pond and was not therefore sampled. I will continue to monitor the site for any irregularities. <br />Also enclosed are monthly NOAA weather summaries for the reporting period and WET test report forms as <br />applicable. . <br />Trapper is required to maintain sediment levels in ponds at or below 60% of the pond volume. All outfalls have <br />been properly maintained and no ponds exceeded the 60% threshold for sediment accumulation. All structures <br />operated properly and were not compromised in any way. All other operations were properly conducted concerning <br />the sediment control structures at Trapper Mine. <br />Please contact me if you have any questions regarding the enclosed information, 970 -826 -6143 <br />Sincerely, I <br />,)a Graham Roberts <br />Environmental Engineer <br />GCR [WATER/DMR, Quarterly Letter4th Quarter 20141 <br />Enclosure <br />C Jared Ebert, CDRMS <br />File 109.2.7 <br />I certify under penalty of law that this document and all attachments were prepared under my' <br />direction or supervision in accordance with a system designed to assure that qualified personnel <br />properly gather and evaluate the information submitted. Based on my inquiry of the person or <br />persons who manage the system, or those persons directly responsible for gathering the <br />information, the information submitted is to the best of my knowledge and belief, true, accurate, <br />and complete. I am aware that there are significant penalties for submitting false information, <br />including the possibility of fine and imprisonment for knowing violations. <br />Jame�Xi. att ern <br />President & General Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.