Laserfiche WebLink
2.05.3 <br />Design and Construction <br />The Rail Spur will be constructed to the Union Pacific standards shown in Exhibit <br />16. <br />The Applicant commits to use best management practices, which could include <br />silt fence and or straw bales during construction of the loadout to ensure <br />protection of the watershed. <br />Permit Application 2.05 -10 01/12 <br />