Laserfiche WebLink
2.05.6 Mitigation of the Impacts of Mining Operations <br />Records of the above monitoring will be maintained on site and submitted to the <br />Division annually in the form of an annual hydrology report. The annual hydrology <br />report (AHR) will be submitted each year on or before April 30th. Discharge <br />monitoring reports for the NPDES permit will be submitted to the Division on a <br />quarterly basis, as required in Rule 4.13(2)(a)(iii). <br />The data obtained from the monitoring program outlined above will be utilized to <br />determine if the operation is having an impact on the hydrologic balance. Impact <br />on the hydrologic balance will be evaluated by analyzing rapid and /or unanticipated <br />changes at a monitoring site. <br />Permit Application 2.05 -65 01/12 <br />