Laserfiche WebLink
2.05.3 <br />Topsoil will be removed by rubber tired scrapers with the assistance of tracked <br />dozers or a track mounted backhoe and truck equipment spread. Topsoil material <br />generated from the initial disturbance will be placed in the stockpiles shown on <br />Map No. 16, Surface Facilities. A topsoil stockpile will be located on each side of <br />Reed Wash. The following table shows the volume of topsoil that will be salvaged <br />from the disturbed area. <br />Topsoil Salva a Volume <br />Location <br />Salvage Area <br />Acres <br />Thickness <br />Topsoil <br />Salvage <br />Volume C.Y. <br />West of Reed Wash <br />6.6 <br />6" <br />5,324 <br />East of Reed Wash <br />6.0 <br />6" <br />4,872 <br />Totals <br />12.6 <br />10,196 <br />A total of 38.1 acres will be disturbed during construction of the rail spur and <br />loadout facilities. As can be seen on Map 19, Previously Disturbed Area, a <br />significant portion of the disturbed area east of Reed Wash has been previously <br />disturbed so no topsoil is available for salvage in those areas. <br />Permit Application 2.05 -25 01/12 <br />