My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-01-26_REVISION - C1996083
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2015-01-26_REVISION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:56:54 PM
Creation date
1/27/2015 7:42:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
1/26/2015
Doc Name
Revised Midterm Review (MT-4) & Reclamation Cost Estimate
From
DRMS
To
Bowie Resources, LLC
Type & Sequence
MT4
Email Name
SLB
DIH
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
570
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 2 Mine C1996083 Midterm Review No. 4 (MT -4) Page 3 of 567 <br />071 <br />Remove Haul Road Subbase and Place on Gob Pile <br />#1 <br />SCRAPERI <br />1 <br />30.54 <br />$17,942.00 <br />072 <br />Rip Truck Loadout Road <br />RIPPER <br />4 <br />2.14 <br />$3,152.00 <br />073 <br />Haul Truck Loadout Subbase to Gob Pile #1 <br />SCRAPERI <br />1 <br />12.75 <br />$7,488.00 <br />074 <br />Rip Upper Haul Road Asphalt Prior to Road <br />Narrowing <br />RIPPER <br />4 <br />2.95 <br />$4,334.00 <br />075 <br />Pull Back/Haul Fill Mat'l from Upper Haul Rd <br />Narrowing <br />TRUCKI <br />1 <br />141.47 <br />$96,649.00 <br />076 <br />Regrade Narrowed Section of Haul Road <br />DOZER <br />4 <br />26.11 <br />$35,786.00 <br />077 <br />Rip Gob Pile #1 Road <br />RIPPER <br />4 <br />2.35 <br />$3,465.00 <br />078 <br />Regrade Gob Pile #1 Road <br />DOZER <br />4 <br />5.17 <br />$7,549.00 <br />079 <br />Rip Access Road <br />RIPPER <br />4 <br />0.73 <br />$1,082.00 <br />080 <br />Haul Access Road Surface to Gob Pile #1 <br />SCRAPERI <br />1 <br />4.86 <br />$2,854.00 <br />081 <br />Regrade Access Road <br />DOZER <br />4 <br />1.79 <br />$2,459.00 <br />082 <br />Rip Freeman Gulch Vent Shaft Light -Use Road <br />RIPPER <br />4 <br />0.20 <br />$307.00 <br />083 <br />Backfill and Regrade Haul Road to Gob Pile #2 <br />DOZER <br />4 <br />0.44 <br />$640.00 <br />084 <br />Rip Lower Haul Road <br />RIPPER <br />4 <br />0.95 <br />$1,395.00 <br />085 <br />Regrade Lower Haul Road <br />DOZER <br />4 <br />36.46 <br />$53,278.00 <br />086 <br />Regrade Light Use Roads from MRs and TRs <br />DOZER <br />4 <br />79.85 <br />$116,694.00 <br />090 <br />Finish Grade Disturbed Mine Area <br />GRADER <br />1 <br />129.92 <br />$18,161.00 <br />091 <br />Finish Grade Train Loadout <br />GRADER <br />1 <br />16.91 <br />$2,364.00 <br />092 <br />Finish Grade B -Seam Portal Bench <br />GRADER <br />1 <br />6.91 <br />$967.00 <br />093 <br />Finish Grade Gob Piles #1, #2, #3, and #4 <br />GRADER <br />1 <br />50.64 <br />$7,079.00 <br />095 <br />Backfill and Regrade Pond B <br />DOZER <br />1 <br />7.63 <br />$2,786.00 <br />096 <br />Backfill and Regrade Pond C <br />DOZER <br />1 <br />11.61 <br />$4,115.00 <br />097 <br />Backfill and Regrade Gob Pile Pond D <br />DOZER <br />1 <br />8.18 <br />$2,900.00 <br />098 <br />Backfill and Regrade Pond F <br />DOZER <br />1 <br />10.87 <br />$3,852.00 <br />099 <br />Backfill and Regrade Pond J <br />DOZER <br />1 <br />24.64 <br />$8,733.00 <br />100 <br />Backfill and Regrade Pond K <br />DOZER <br />1 <br />1.52 <br />$540.00 <br />101 <br />Excavate for Post - mining Channel at B -Seam <br />Portals <br />EXCAVATE <br />2 <br />0.63 <br />$313.00 <br />102 <br />Postmining Channel Construction <br />NA <br />1 <br />69.02 <br />$33,669.83 <br />106 <br />Plug and seal EM98 -1 <br />BOREHOLE <br />1 <br />12.00 <br />$5,631.61 <br />106a <br />Plug and seal GEO- TECH -01 <br />BOREHOLE <br />1 <br />12.00 <br />$4,997.46 <br />106aa <br />Plug and seal Gob Pile geotech 9 (MR29) <br />BOREHOLE <br />1 <br />6.00 <br />$1,470.95 <br />
The URL can be used to link to this page
Your browser does not support the video tag.