Laserfiche WebLink
Bowie No. 2 Mine C1996083 Midterm Review No. 4 (MT -4) Page 2 of 567 <br />022 <br />Replace Fill from Material Storage Area to Water <br />Tank Bench <br />SCRAPERI <br />1 <br />1.51 <br />$888.00 <br />023 <br />Regrade Borrow Area <br />DOZER <br />4 <br />19.14 <br />$26,238.00 <br />024 <br />Regrade Hubbard Creek Vent Shaft Pad <br />DOZER <br />4 <br />1.89 <br />$2,586.00 <br />025 <br />Regrade Upper Parking Lot Expansion Area <br />EXCAVATE <br />1 <br />3.65 <br />$908.00 <br />026 <br />Haul Mat'l from Bowie No. 1 Stkpl to Hubbard Crk <br />Vent Shaft <br />TRUCKI <br />1 <br />26.68 <br />$25,814.00 <br />027 <br />Haul Rock to Vent Shafts for Disposal <br />TRUCKI <br />1 <br />10.50 <br />$4,301.00 <br />036 <br />Spread Uncompacted Refuse on Gob Pile #2 <br />DOZER <br />4 <br />89.54 <br />$122,722.00 <br />037 <br />Spread Uncompacted Refuse at Gob Pile #3 <br />DOZER <br />4 <br />100.73 <br />$138,062.00 <br />038 <br />Compact Material Hauled to Gob Pile #1 <br />COMPACT <br />1 <br />13.38 <br />$1,978.00 <br />039 <br />Compact Refuse on Gob Pile #2 <br />COMPACT <br />1 <br />153.51 <br />$22,691.00 <br />040 <br />Haul refuse out of Gob Pile #2/ 93 drying areas for <br />placement <br />TRUCKI <br />1 <br />909.13 <br />$324,086.00 <br />041 <br />Compact Refuse at Gob Pile #3 <br />COMPACT <br />1 <br />166.94 <br />$24,677.00 <br />042 <br />Haul Topsoil from Stockpile Area to Gob Pile #1 <br />SCRAPERI <br />1 <br />2.18 <br />$1,283.00 <br />043 <br />Place 3.5' of Coverfill on Gob Pile #1 <br />SCRAPERI <br />1 <br />15.80 <br />$9,285.00 <br />044 <br />Place Coverfill from Stockpiles on Gob Pile #2 <br />SCRAPERI <br />1 <br />173.74 <br />$102,072.00 <br />045 <br />Haul Cover Material from Gob Pile #3 to Gob Pile <br />#2 <br />TRUCKI <br />1 <br />235.64 <br />$96,532.00 <br />046 <br />Place 2.5' of Coverfill on Gob Pile #3, from <br />stockpile <br />SCRAPERI <br />1 <br />172.47 <br />$101,324.00 <br />050 <br />Compact Backfilled D- Portal Bench,Roads, & <br />Utility Corridor <br />COMPACT <br />1 <br />577.52 <br />$85,364.00 <br />051 <br />Compact Backfilled Material at Truck Loadout /Coal <br />Stockpile <br />COMPACT <br />1 <br />63.35 <br />$9,365.00 <br />052 <br />Compact Backfilled Train Loadout <br />COMPACT <br />1 <br />215.94 <br />$31,919.00 <br />053 <br />Compact B -Seam Portal Bench <br />COMPACT <br />1 <br />128.72 <br />$19,028.00 <br />054 <br />Compact Backfilled Freeman Gulch Vent Shaft Pad <br />COMPACT <br />1 <br />1.83 <br />$271.00 <br />060 <br />Rip Utility Bench <br />RIPPER <br />4 <br />0.30 <br />$452.00 <br />061 <br />Rip D- Portal Bench <br />RIPPER <br />4 <br />3.71 <br />$5,429.00 <br />062 <br />Rip Truck Loadout /Coal Stockpile Area <br />RIPPER <br />4 <br />2.06 <br />$3,016.00 <br />063 <br />Rip Regraded Mine Area Prior to Topsoil <br />Replacement <br />RIPPER <br />4 <br />59.09 <br />$86,362.00 <br />064 <br />Rip Train Loadout Facilities and Railbed Benches <br />RIPPER <br />4 <br />7.69 <br />$11,242.00 <br />065 <br />Rip B -Seam Portal Bench <br />RIPPER <br />4 <br />3.71 <br />$5,429.00 <br />066 <br />Rip Rock Laydown Pad Topsoil <br />RIPPER <br />1 <br />0.43 <br />$157.00 <br />070 <br />Rip Haul Roads (Portion Being Reclaimed) & Old <br />Truck Loadout <br />RIPPER <br />4 <br />116.47 <br />$171,030.00 <br />