My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-01-14_PERMIT FILE - M1977342
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1977342
>
2015-01-14_PERMIT FILE - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:56:36 PM
Creation date
1/26/2015 4:18:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Permit File
Doc Date
1/14/2015
Doc Name
Follow-Up Notice
From
Climax Molybdenum
To
DRMS
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Climax Molybdenum <br />A Freeport- McMoRan Company <br />January 14, 2015 <br />Via Email and UPS Priority Mail <br />COLORADO OPERATIONS <br />Henderson Mill <br />19302 County Road 3 <br />Parshall, CO 80468 <br />Phone (303) 569 -3221 <br />RECEIVED <br />JAN 1 2015 <br />DIVISION OF RECLAMATION <br />Mr. Peter Hays <br />MINING AND SAFETY <br />Division of Reclamation, Mining and Safety <br />1313 Sherman St., Rm. 215 <br />Denver, CO 80203 <br />Re: `Follow -up Notice for Mill Tailing Delivery Line, Droptower 1 -7 Overflow, Permit No. M -1977- <br />342 <br />Mr. Hays: <br />Henderson Mill is providing this written follow -up notice to a phone call made to you on January 8, 2015 <br />pursuant to Rule 8.1 and 8.2 of the DRMS Rules and Regulations. <br />This notice is regarding process water which escaped from (primarily) droptower 5, but also from <br />droptowers 1 -4 and 6 & 7, to some extent. The Tailing Delivery Line (hereafter referred to as the TDL) is <br />designated as an environmental protection facility in Henderson's Environmental Protection Plan. The <br />overflow is believed to have begun just after 12:00 A.M. (midnight) the morning of January 8, 2015. It is <br />believed to have lasted a very short period of time (-5 minutes), based on flow trending from mill <br />operations. These trends also indicated that a spike in pressure and flow occurred just after midnight for <br />a brief duration. We believe that approximately 9,000 gallons of tailing material was released during this <br />event. This volume was factoring the tailing flow rate, the duration of the spike and assuming that <br />approximately 10 percent of the total flow was released from the towers, while the remaining flow <br />continued along its intended course, through the TDL. All material released from the TDL flowed along <br />the alignment of the TDL to the No. 1 Cutout structure, located below the number 12 droptower. A <br />fraction of the material, while flowing along this path also became entrained in snow. <br />(a) After discovering the issue, Henderson employees began closely monitoring the situation <br />to determine whether flow should be diverted. The flow had normalized following the <br />short-lived event, so flow diversion to the Emergency Cut Out structure was not <br />necessary. <br />(b) Mill process water flow did not adversely impact human health, property or the <br />environment. All material associated with this event flowed along the TDL alignment and <br />access road. Any drainage from this area flows along a private Mill access road to a <br />culvert, where it comingles with other process waters flowing into the tailing <br />impoundment. <br />
The URL can be used to link to this page
Your browser does not support the video tag.