Laserfiche WebLink
M -1994 -027 — Longmont Operation RECEIVED <br />r <br />(aka Tull Farm) <br />I -.eHASE <br />Annual Report Map (NTS) <br />JAN 21 2015 I THREE <br />MINING ` <br />Report Year Ended DIVISION OF RECLAMATION <br />December 31, 2014 MINING AND SAFETY <br />Phase Two Mining Area <br />Acres <br />A x. <br />Disturbances <br />2014 <br />26.00 <br />2013 <br />0.25 <br />Reclamation <br />2014 — partially backfilled <br />4 <br />'"' olscf <br />PIPE- <br />.,. \ <br />r <br />MINING <br />AREA <br />an <br />`PHASE 2 DEWATERING TRENCH <br />PHASE FOUR —A <br />MINING AREA TO <br />C NSIST OF BATCH <br />PLANT AREAS <br />r <br />PHASE \ <br />ONE <br />LD MINING <br />AREA <br />DISCHARGE PIPE OUR) \ <br />PHASE T DEWATERING T�tNC,H -- <br />� wV4 COR. er0. <br />10 <br />�Z"1 Raw GTH r r. <br />GRAVEL PLANT <br />FIDE t SCALE NO <br />1 DEWATERING TRENCH <br />RHO COWrY /POLIO At& PO W <br />1 <br />TRANSFER <br />SURGE PILE 0 <br />i <br />`PHASE 2 DEWATERING TRENCH <br />PHASE FOUR —A <br />MINING AREA TO <br />C NSIST OF BATCH <br />PLANT AREAS <br />r <br />PHASE \ <br />ONE <br />LD MINING <br />AREA <br />DISCHARGE PIPE OUR) \ <br />PHASE T DEWATERING T�tNC,H -- <br />� wV4 COR. er0. <br />10 <br />�Z"1 Raw GTH r r. <br />GRAVEL PLANT <br />FIDE t SCALE NO <br />1 DEWATERING TRENCH <br />RHO COWrY /POLIO At& PO W <br />1 <br />TRANSFER <br />SURGE PILE 0 <br />