Laserfiche WebLink
Snowcap Coal Company, Inc. <br />-7- 2014 Annual Reclamation Report <br />15. Roadside Refuse Borrow Area - Area east of the Roadside <br />Refuse Pile excavated during 2002 for cover material for the <br />Roadside Refuse Pile. Phase I Bond Release was approved with <br />SL -2 on October 27, 2003. Located in SE% Section 34, T10S, <br />R98W, 6" P.M. <br />Area — 4.5 acres <br />Date - November 2002 <br />Seed Mix - "Seed Mix, Table 14 -8 ", Upland Components <br />16. Roadside Refuse Disposal Area (including new Upper <br />Diversion Ditch) - Re- contoured the refuse pile and placed 20" of <br />cover material and 6" of topsoil on all slopes and benches. Seeded <br />with approved seed mix during November. Phase I Bond Release <br />was approved on 7.1 acres with SL -2 on October 27, 2003 and 1.3 <br />acres with SL -4 on January 11, 2009. The 1.3 acres achieved final <br />Phase II & III Bond Release with SL -6, approved on Dec. 14, 2010. <br />Located in the SE% Section 34, T10S, R98W, 6th P.M. <br />Area - 8.4 acres <br />Date - November 2002 <br />Seed Mix - "Seed Mix, Table 14 -8 ", Upland Components <br />Phase III Bond Release - 1.3 acres <br />17. Roadside South Portal Upper Diversion Ditch - This ditch was <br />removed and restored to approximate original contours during the <br />excavation of the Roadside Refuse Borrow Area. It was <br />permanently seeded with an approved seed mix during November <br />of 2002. Phase I Bond Release was approved with SL -2 on <br />October 27, 2003. Located in the SEY4 Section 34, T10S, R98W, <br />6th P.M. <br />Area - 1.1 acres <br />Date - November 2002 <br />Seed Mix - "Seed Mix, Table 14 -8 ", Upland Components <br />18. Cameo Refuse Disposal Area No. 1 - Re- contoured upper bench, <br />regraded the top of the pile, covered all slopes, benches and the <br />top of the pile with 24 inches of material. Established collection <br />ditches and rip- rapped the ditches in accordance with the <br />reclamation plan. This pile was seeded during April 2002. Phase <br />Bond Release was approved with SL -2 on October 27, 2003. <br />Approximately one (1) acre was re- disturbed in December 2009 on <br />top of CRDA #1 as a lay down area for coal refuse delivered from <br />McClane Canyon Mine and remaining SCC coal fines clean up. <br />The one acre of re- disturbance was reclaimed and reseeded in <br />September 2010. Located in the SE' /4, Section 28, T10S, R98W, <br />6th P.M. <br />Area - 14.8 acres; 1 acre (reseed) <br />Date - April 2002; September 2010 (reseed) <br />