My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-01-23_REPORT - C1981041
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981041
>
2015-01-23_REPORT - C1981041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 10:17:23 AM
Creation date
1/23/2015 12:48:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Report
Doc Date
1/23/2015
From
J.E. Stover & Associates, Inc
To
DRMS
Annual Report Year
2014
Permit Index Doc Type
Annual Reclamation Report
Email Name
BFB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Snowcap Coal Company, Inc. <br />-8- 2014 Annual Reclamation Report <br />Seed Mix - "Seed Mix, Table 14 -13 ", Upland Components <br />"Seed Mix, Table 14 -8 ", Upland Components (reseed) <br />19. Cameo Refuse Disposal Area No. 2 - The final reclamation of this <br />refuse pile included covering and top soiling the upper benches and <br />the top of the pile. Also a new diversion ditch was constructed just <br />above the pile. The Old Upper diversion ditch was reclaimed and <br />restored to approximate original contours and then reseeded. <br />Phase I Bond Release was approved with SL -2 on October 27, <br />2003. Located in the SE %, Section 28 and the SWY4, Section 27, <br />T10S, R98W, 6th P.M. <br />Area - 20.2 acres <br />Date - April 2002 for CRDA2 and November 2002 for Upper <br />Diversion <br />Seed Mix - For CRDA2 - "Seed Mix, Table 14 -13 ", Upland <br />Components <br />Seed Mix - For Upper Diversion - "Seed Mix, Table 14 -8 ", Upland <br />Components <br />20. Cameo Borrow Area No. 2 - Material was excavated from CBA2 <br />for the covering of the CRDA1. Approximately 5.1 acres was seed <br />in April 2002, however a further disturbance will be needed here at <br />the removal of Pond 11. Phase I Bond Release was approved with <br />SL -2 on October 27, 2003. Located in the SE %, Section 28, T10S, <br />R98W, 6th P.M. <br />Area - 2.7 acres <br />Date - April 2002 <br />Seed Mix - "Seed Mix, Table 14 -13 ", Upland Components <br />Pond 11 was filled, regraded, top - soiled and seeded. <br />Approximately 0.6 acres were re- disturbed and re- seeded during <br />the reclamation of Pond 11. The acres associated with the <br />realignment of Coal Gulch, approximately 1.4 acres, were approved <br />as permanent features on August 12, 2012 with PR -5. <br />Area — 1.2 acres <br />0.6 acres (re- disturbed) <br />Date — October 2012 <br />Seed Mix — "Seed Mix, Table 14 -8 ", Upland Components <br />21. Access Road and Power lines to No. 2 West Portals - By <br />agreement with the Bureau of Land Management, the access road <br />was left in place. The Power line reclamation was finished during <br />2002. <br />Area - 3.8 acres <br />Date - July 2002 <br />Seed Mix - No backfilling or seeding required <br />
The URL can be used to link to this page
Your browser does not support the video tag.