Laserfiche WebLink
reclaimed area. Any settling that may take place will occur under the weight of the stockpiles <br /> and is filled in by the material that is stockpiled. <br /> 4. Bonding of Imported Materials: The mining plan for this site is to remove enough material to <br /> meet our needs for one construction season. In turn,the mined area is already open so that the <br /> fill material can be dumped directly into the mined area. We do not anticipate any stockpiles of <br /> non-product material at the site. Also, not all of the fill material is imported material; we have <br /> several operations at this site that develop materials that are not suitable for resale. These <br /> byproducts such as waste material from our soil screening and mixing operation are used as <br /> backfill for the mined area. Additional bonding should not be necessary for this site. <br /> Hopefully this ,adi resses ail of your concerns for the Technical Revision at th.s site. Please contact me if <br /> you have any further questions. <br /> Sincerely, <br /> Tom Smith <br /> General Manager <br /> Rocky Mountain Materials and Asphalt, Inc. <br /> 719-473-3100 <br />