My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-01-20_INSPECTION - C1981020
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981020
>
2015-01-20_INSPECTION - C1981020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:56:42 PM
Creation date
1/20/2015 8:02:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981020
IBM Index Class Name
Inspection
Doc Date
1/20/2015
Doc Name
Inspection Report
From
DRMS
To
CAM Mining, LLC
Inspection Date
11/25/2014
Email Name
ZTT
MPB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Loma Loadout sign. <br />Vegetation growth at Loma Loadout. <br />TOPSOIL — Rule 4.06 <br />Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; Redistribution 4.06.4: <br />Topsoil depth was checked at the reclaimed site. Munger Canyon Mine's permit requires a minimum of topsoil <br />replacement thickness of 6 ". <br />Two topsoil replacement holes were dug by hand with a "sharpshooter" shovel at the small area adjacent to the <br />access road. Both TS hole #1 and TS hole #2 were dug to greater than 6 ". <br />Topsoil verification holes were dug on the reclaimed waste pile. TS hole 43 measured A" and the fourth topsoil <br />verification hole was dug in the reclaimed area between the waste pile and the recently reclaimed sediment pond. <br />TS hole 44 measured >6 ". The soil was firm and partially frozen in areas. Holes were dug to the required topsoil <br />replacement depth and not to an obvious color or textural change <br />No topsoil verification holes were dug along the reclaimed hual road. Topsoil was not replaced at the haul road due <br />to no topsoil existing along the haul road during construction. <br />One topsoil verification hole was dug at the reclaimed portal bench. TS hole 45 >7 ". <br />TS hole #1. TS hole #3. <br />
The URL can be used to link to this page
Your browser does not support the video tag.