Laserfiche WebLink
Scraper Worksheet Cont'd Task#001 Page 1 of 2 <br /> SCRAPER TEAM WORK <br /> Task description: Haul Product to Pit,7,600 CY,800 ft <br /> Site: Buffalo No 1 Permit Action: TR-01 2014(3) Permit/Job#: M1978011 <br /> PROJECT IDENTIFICATION <br /> Task#: 001 State: Colorado Abbreviation: None <br /> Date: 12/30/2014 County: Elbert Filename: M011-001 <br /> User: AME <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COSTShift basis: 1 per day <br /> Equipment Description <br /> -Scraper: Cat 637G <br /> -Dozer: NA <br /> Support Equipment-Load Area: NA <br /> -Dump Area: NA <br /> Road Maintenance—Motor Grader: NA <br /> -Water Truck: NA <br /> Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 NA NA NA NA NA <br /> Ownership cost/hour: $107.02 NA NA NA NA NA <br /> Operating cost/hour: $239.91 NA NA NA NA NA <br /> Ripper op.cost/hour: NA NA NA NA NA NA <br /> Operator cost/hour: $33.56 NA NA NA NA NA <br /> Unit Subtotals: $380.50 NA NA NA NA NA <br /> Number of Units: 2 0 0 0 0 0 <br /> Group Subtotals: Work: $761.00 Support: $0.00 Maint: $0.00 <br /> Total work team cost/hour:$761.00 <br /> MATERIAL QUANTITIES <br /> Initial volume: 7,600 CCY Swell factor: 1.230 <br /> Loose volume: 9,348 LCY <br /> Source of estimated volume: Division of Reclamation,Mining&Safety <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Scraper Bowl(volume)Basis: <br /> Material weight: 2,500 lbs/LCY Struck Volume: 24.00 LCY <br /> Material description: Clay-Dry Heaped Volume: 34.00 LCY <br /> Rated Payload: 81,600 pounds Average Volume: 29.00 LCY <br /> Payload Capacity: 32.64 LCY Adjusted Capacity: 29.00 LCY <br /> CIRCES Cost Estimating Software <br />