Laserfiche WebLink
COST SUMMARY WORK <br /> Task description: Cost Summary <br /> Site: Buffalo No 1 Permit Action: TR-01 2014(3) Permit/Job#: M1978011 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 12/30/2014 County: Elbert Filename: MO11-000 <br /> User: AME <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Haul Product to Pit,7,600 CY,800 ft SCRAPERI 1 7.15 $5,443.00 <br /> 002 Haul Scrap Brick to Pit,4,500 CY,550 ft SCRAPER1 1 3.12 $2,371.00 <br /> 003 Haul Overburden to Pit, 15,731 CY,710 ft SCRAPER1 1 14.50 $12,432.00 <br /> 004 Rip Stockpile Area,4.4 acres,500 ft length RIPPER 1 7.02 $1,153.00 <br /> 005 Spread Topsoil on(North)4.4 acres,6 inches SCRAPER1 1 2.12 $1,617.00 <br /> 006 Spread Topsoil on(South)4.3 acres,6 inches SCRAPER1 1 2.45 $1,864.00 <br /> 007 Revegetation of 8.7 acres REVEGE 1 34.40 $3,523.00 <br /> 008 Mobilization/Demobilization MOBILIZE 1 6.90 $6,505.00 <br /> SUBTOTALS: 77.66 $34,908 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02% Total= $705.14 <br /> Performance bond: 1.05% Total= $366.53 <br /> Job superintendent: 0.00 hrs Total= $0.00 <br /> Profit: 10.00% Total= $3,490.80 <br /> TOTAL 0&P= $4,562.47 <br /> CONTRACT AMOUNT(direct+O&P)= $39,470.47 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): 0.00 Total= 0.00 <br /> Engineering work and/or contract/bid preparation: 0.00% Total= $0.00 <br /> Reclamation management and/or administration: 5.00% $1,973.52 <br /> CONTINGENCY: 3.00 Total= $1,047.24 <br /> TOTAL INDIRECT COST= $7,583.23 <br /> TOTAL BOND AMOUNT(direct+indirect)= $42,491.23 <br />