Laserfiche WebLink
amec <br /> Secondary Underdrain: No work was performed during this reporting period. <br /> Tertiary Underdrain: No work was performed during this reporting period. <br /> Leak Detection: No work was performed during this reporting period. <br /> B) Underground Workings: <br /> No work was performed during this reporting period. <br /> C) Geomembrane: <br /> Phase 1 80-mil DSMS LLDPE Liner Installation: (Installation is suspended at this time.) <br /> D) Drain Cover Fill (DCF) (Placement operations suspended at this time.) <br /> E) High Volume Solution Collection System Piping (HVSCS): <br /> No work was performed during this reporting period. <br /> II) Storm Water Management <br /> Best Management Practices(BMPs)are being performed. <br /> CQA ACTIVITIES: <br /> I) Field Activities: Field activities and observation during this reporting period included: Snow <br /> removal. <br /> II) Laboratory Activities: None. <br /> General Project Items <br /> Meetings and Discussions: Ames daily safety meetings <br /> Summary of Concerns: None. <br /> CC&V: Daily updates, reporting, and scheduling are some of the tasks occurring between CC&V <br /> Projects, AMEC, and Ames. <br /> Miscellaneous:Work was canceled on December 22 and 23 due to inclement weather. <br /> Deliveries: None. <br /> Submitted by: Eric Lorenson Date: January 6, 2015 <br /> Reviewed Date: January 6, 2015 <br /> Tim Burkhard <br /> Project Resident <br /> Phone: 719-689-2986 <br /> Reviewed Projects <br /> y: _,` � � —� / / <br /> Reviewed B Date: / 7 �5 <br /> Reviewed By: jj r�/ � Date: /- fey <br /> 201412-27-rle2 weekly final Page 2 of 3 <br />