amec9 <br /> CRIPPLE CREEK &VICTOR GOLD MINING Co. <br /> ANGLOGOLD ASHANTI (COLORADO) <br /> SQUAW GULCH (VLF)WEEKLY REPORT <br /> Owner: Cripple Creek&Victor Gold Mining Co. Project Number: 74201125N0 <br /> Project: Squaw Gulch Valley Leach Fill (VLF) Week Ending: December 27, 2014 <br /> Location: Cripple Creek&Victor Gold Mine, CO <br /> Contractor: Ames Construction, Inc. <br /> Reporting Period: 12.21.2014 through 12.27.2014 <br /> Days S M T W T F S <br /> W W H H H <br /> Work Shifts <br /> D=Day Shift H=Holiday W=Weather <br /> Ambient Temperature Ranges During Week Weather Conditions During Week: <br /> Highs: 20°F to 24°F Cloud Cover: Partly cloudy to Overcast <br /> Lows: 12°F to 17°F Precipitation: Snow Monday and Tuesday <br /> Wind: Variable <br /> Ames: Continuing construction tasks for the Valley Leach Facility(VLF). <br /> Planning: Continuing construction activities and scheduling for the VLF. <br /> CONSTRUCTION ACTIVITIES AND PROGRESS: <br /> I) Earthworks <br /> A) VLF (Phase 1, and 2) No work was conducted due to inclement weather and the Holidays. The <br /> contractor scheduled no personnel to perform any work associated with VLF construction from <br /> December 24, 2014 through January 4, 2015. <br /> Topsoil/Overburden Stripping: None. <br /> Tree Grubbing and Clearing, Chipping: None. <br /> Production Drilling: None. <br /> Production Blasting: None. <br /> Structural Fill: No work was performed during this reporting period. <br /> Subgrade: (Operations Temporarily Suspended) <br /> Soil Liner Fill (SLF): (Placement Operations Temporarily Suspended) <br /> Cameron Site: SLF processing was temporarily halted for processing equipment repair. <br /> Underdrain System: <br /> Primary Underdrain: Complete. <br /> 2014-12-27-mIe2 weekly final Page 1 of 3 <br />