Laserfiche WebLink
amec • <br /> ATTACHMENT A <br /> AMEC -2014 CQA Field Staff Schedule MLE2 <br /> Name Sun. — Mon. Tues. Wed. Thurs. Fri. Sat. <br /> Dec. 14 Dec. 15 Dec. 16 Dec. 17 Dec. 18 Dec. 19 Dec. 20 <br /> Tim Burkhard PR PR PR PR <br /> Robert Redd UG UG UG UG UG <br /> Tyler Browning GT GT GT GT GT <br /> Eric Lorenson ST ST ST ST ST _ <br /> Denis Koval ST ST ST ST <br /> Al Frias _ ST ST ST ST ST _ <br /> Rick Buxton _ ST ST ST ST ST <br /> Razi Molloy LT LT LT LT LT <br /> Andrea Meduna PM <br /> — <br /> LEGEND: <br /> PL= Project Lead <br /> PM= Project Manager <br /> PCE= Project Certifying Engineer <br /> PE = Project Engineer <br /> PR = Project Resident <br /> LG =Lead Geosynthetics Engineer <br /> LS = Lead Soils Technidan <br /> ST= Soil Technician <br /> LT= Laboratory Technician <br /> GL= Geosynthetics Lead <br /> GT= Geosynthetics Technidan <br /> FLM= Field/Laboratory Manager <br /> UG = Underground Working Remediation <br /> SE= Senior Engineer <br /> GS=Geophysics Survey Geologist <br /> HY= Highway Design Engineer <br /> 2014-12-20-mle2 weekly final Page 4 $6 <br />