Laserfiche WebLink
amec . <br /> ` <br /> II) Storm Water Management <br /> Best Management Practices(BMPs)are being performed. <br /> CQA ACTIVITIES: <br /> I) Field Activities: Field activities and observation during this reporting period included: Slope grading <br /> and fill placement; SF and SLF sampling; clearing and grubbing; underground working remediation <br /> and confirmatory drilling; and topsoil removal. <br /> II) Laboratory Activities: Permeability, Atterberg limits, moisture, and sieve analysis laboratory testing <br /> continued. <br /> The following samples were collected and returned to AMEC's laboratory for analysis: <br /> Soil Liner Fill Sample SLF-168C (Control sample) <br /> Structural Fill Sample SF-112R (Record sample) <br /> General Project Items <br /> Meetings and Discussions: <br /> The Weekly Contractor Meeting was held December 17, 2014 (AMEC, CC&V,Ames) <br /> Ames daily safety meetings <br /> Summary of Concerns: None. <br /> CC&V: Daily updates, reporting, and scheduling are some of the tasks occurring between CC&V <br /> Projects, AMEC, and Ames. <br /> Miscellaneous: None. <br /> Deliveries: None. <br /> Submitted by: Eric Lorenson Date: January 6, 2015 <br /> Reviewedby— r Date: January 6, 2015 <br /> Tim Burkhard <br /> Project Resident <br /> Phone: 719-689-2986 <br /> CC&V Projects ��� <br /> Reviewed By: A!/ . i °- Date: / 77 4 s <br /> Reviewed By: ' Date: f- sf !S <br /> 2014-12-20-mle2 weekly final Page 3 016 <br />