Laserfiche WebLink
'J <br />1 <br />t <br />J <br />t <br />1 <br />r <br />allowed by weather conditions. By Mined Land Reclamation Board order dated <br />October 29, 2014, the implementation is required to commence within 30 days of <br />Division approval and be completed with 180 days thereafter. Based on this <br />timeframe we will be able to complete drain installation and backfill by Spring, <br />2015 and commence reclamation thereafter. Reclamation will be completed by <br />the 180 day deadline. <br />In summary the anticipated timeline is as follows: <br />Activity Days after Approval <br />Drain Installation and Backfill 30 — 90 days <br />Reclamation 90 —180 days <br />Reclamation of the affected area will be done in one phase. As soon as weather <br />permits the areas will be reseeded. The soils in the area are loamy. Table 1 is the <br />recommended seed mix. The only exception may be the Einspahr property. We <br />will consult with the landowner to determine their desired grass type. <br />Table 1. Recommended Seed Mix for Loamy Soils <br />