1 <br />1 <br />1 <br />1 <br />1 <br />t <br />1 <br />1 <br />1 <br />1 <br />EXHIBIT E — Reclamation Plan <br />The final reclamation will be the same as the previous 2004 amendment with the <br />exception of the area that will be affected by the installation of the French drain. <br />The French drain excavation will be approximately 10' wide by 2,100', <br />approximately 0.48 acres. The area affected by construction activities will be <br />approximately 100' by 2,100', or 4.8 acres. <br />Pursuant to a request from the Einspahrs, Brannan will be filling a portion of their <br />property as part of the consideration for the Einspahrs' authorization for installing <br />the south French drain. This filling activity is occurring outside of the permit <br />amendment and, once in place, will be considered the "existing" topography for <br />purposes of this permit amendment. <br />During excavation for the French drain, the topsoil will be stockpiled and used for <br />reclamation. Since the actual excavation is only 10' in width, the area will be <br />reclaimed with the existing slopes and drainage. <br />Reseeding will occur on both the excavated area and the area affected by the <br />construction of the French drain. Earthmoving will consist of backhoe trenching. <br />The trench will be backfilled with gravel from the present mining of Pit 29. The <br />gravel will extend to within 1 -2 feet of the surface. Native soil will be used to fill <br />to the surface. <br />The post- mining uses will not change from the previous amendment except that <br />the post- mining uses for the added Einspahr parcel will be the uses to which the <br />Einspahrs make of that parcel in their discretion. <br />The reclamation of the affected area will commence immediately upon <br />completion of drain installation and backfill unless such installation and backfill is <br />completed prior to the spring of 2015, then the reclamation will commence as <br />