Laserfiche WebLink
Natural Soda, Inc. <br />2015 PRODUCTION WELL PAIR DRILLING PLAN AND CONSTRUCTION SCHEDULE <br />ITEM <br />Injection Well <br />WK WK WK WK WK <br />2 3 4 5 6 <br />Recovery Well <br />WK <br />1 <br />WK <br />7 <br />WK <br />8 <br />WK <br />9 <br />WK <br />10 <br />WK <br />11 <br />WK <br />12 <br />BUILD DRILL PAD AND MUD PITS <br />X <br />X <br />DRILL & SET CONDUCTOR CASING <br />X <br />MOB DRILLING RIG & RIG UP <br />X <br />X <br />MIX DRILLING MUD <br />X <br />X <br />DIRECTIONALLY DRILL SURFACE /INTERMEDIATE HOLE <br />X <br />X <br />X <br />X <br />RUN OPEN HOLE LOGS, RUN SURF /INT CASING & CEMENT, RUN CBL <br />X <br />X <br />DIRECTIONALLY DRILL HORIZONTAL HOLE <br />X <br />X <br />X <br />LOG WELL as necessary) <br />X <br />X <br />RUN PRODUCTION TUBING <br />X <br />DEMOB DRILLING RIG <br />X <br />INSTALL WELL HEADS <br />X <br />Daub & Associates, Inc. 12/31/2014 <br />