Laserfiche WebLink
East <br />15H-R Drilling and Well Completion Information <br />0.0'- 100.0' MD KB; 0.0'83.0' MD GL: drill 24.0" conductor hole <br />0.0'-100.0' MD KB; 0.0'-83.5' MD GL: install 16.0" OD conductor casing (J-55, 72.7lb /ft), cement to surface <br />100.0'4228.0'1011) KB; 83.5' - 1211.0' MD GL: directional drill 12.25" vertical surface hole to KOP <br />100.0' - 1228.0' MD KB; 83.5' - 1211.0' MD GL: install 9.625" OD surface casing (J-55, 40.0lb /ft), cement to surface <br />1228.0'- 2228.0' MD KB; 1211.0'- 2211.0' MD GL: directional drill 8.75" curve portion Intermediate hole, average 9.0° per 100 It <br />1128.0'- 2228.0' MD KB; 1111.0'- 2211.0' MD GL: install 7.0" OD Intermediate casing (J-65, 26 lb/ft), Centek centralizers every 80 -100 ft <br />1128.0'- 2228.0' MD KB; 1111.0'- 2211.0' MD GL: cement Intermediate casing, Portland Type I /ll <br />2228.0' - 2418.0' MD KS; 2211.0'- 2401.0' MD GL: directional drill 6.875" horizontal hole to Injection well pamby, maintain drill path 2' below top of LBB <br />Measured <br />Depth GL �� 5100 <br />8.75" Directional Hole <br />5.875" Directional Hole 1228.0 - 2228.0 MD KB ` r� R-6 <br />2228.0- 2418.0 MD KB 7.0" OD Intermediate Casing ' <br />(Injection Web Pass -By) 1128.0 - 2228.0 MD KB 5000 <br />tr1 rrt�lljr 11,�!r(;,,11'rdlir III rtrir ,,,rrr+h trr,wr��..�+**rm" <br />N I N I <br />Upper Boies Bed <br />OSMB <br />Lower Boies Bed <br />Proposed Drill Path <br />2' Below Top of LBB <br />-Oo <br />`Measured <br />' Depth KB <br />L -5 49DO <br />i <br />4800 <br />4700 <br />4600 <br />4500 <br />Natural Soda, Inc. <br />15 -17 Prognosis Schematic - Recovery <br />Section 34, T1S, R98W Rio Blanco County, CO <br />Daub &Associates bic n Derr: Oscsmesr 70. 1014 <br />700 <br />700 <br />5900 <br />eoo <br />800 <br />West <br />5600 <br />900 <br />900 <br />5700 <br />GL: 6650.0', est <br />1000 <br />KB: 6667.0', est 1000 <br />12.25" Surface Hole <br />5600 <br />100.0.1228.0 MD KB <br />1100 <br />m oo <br />9.625" OD Surface Casing -- <br />5500 <br />0- 1228.0 MD KB <br />1200 <br />1200 <br />Kick -Off Point -� <br />1228.0 MD KB <br />5400 <br />1300 <br />1300 <br />A- Groove <br />5300 <br />1400 1400 <br />R-7 <br />5200 <br />1 1500 <br />13Grome <br />Measured <br />Depth GL �� 5100 <br />8.75" Directional Hole <br />5.875" Directional Hole 1228.0 - 2228.0 MD KB ` r� R-6 <br />2228.0- 2418.0 MD KB 7.0" OD Intermediate Casing ' <br />(Injection Web Pass -By) 1128.0 - 2228.0 MD KB 5000 <br />tr1 rrt�lljr 11,�!r(;,,11'rdlir III rtrir ,,,rrr+h trr,wr��..�+**rm" <br />N I N I <br />Upper Boies Bed <br />OSMB <br />Lower Boies Bed <br />Proposed Drill Path <br />2' Below Top of LBB <br />-Oo <br />`Measured <br />' Depth KB <br />L -5 49DO <br />i <br />4800 <br />4700 <br />4600 <br />4500 <br />Natural Soda, Inc. <br />15 -17 Prognosis Schematic - Recovery <br />Section 34, T1S, R98W Rio Blanco County, CO <br />Daub &Associates bic n Derr: Oscsmesr 70. 1014 <br />