My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-12-29_REVISION - M1978011
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1978011
>
2014-12-29_REVISION - M1978011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:51:53 PM
Creation date
1/7/2015 11:15:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978011
IBM Index Class Name
REVISION
Doc Date
12/29/2014
Doc Name
Adequacy Review- 02
From
DRMS
To
General Shale Brick, Inc.
Type & Sequence
TR1
Email Name
AME
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Worksheet Cont'd Task # TTT Page 2 of 2 <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />0.80 Minutes <br />0.60 Minutes <br />Net Correction: 0.830 0.830 <br />Travel Time: <br />Road Condition: Hard, smooth, stabilized, surfaced, watered, maintained 2.0 <br />Haul Route: <br />Site Altitude: 5900 feet <br />Seg # <br />Scraper <br />Push Dozer <br />Source <br />Altitude Ad': <br />1.000 <br />1.000 <br />(CAT HB) <br />Job Efficiency: <br />0.830 <br />0.830 <br />(CAT HB) <br />Net Correction: 0.830 0.830 <br />Travel Time: <br />Road Condition: Hard, smooth, stabilized, surfaced, watered, maintained 2.0 <br />Haul Route: <br />Site Altitude: 5900 feet <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />550.00 <br />-3.00 <br />Unadjusted unit production/hour: <br />CUUP LCY /Hour <br />Optimal Number of Scrapers per push dozer: <br />CONS <br />JOB TIME AND COST <br />Fleet size: CFLeet Team(s) <br />Total job time: <br />Unit cost: CUnitCost /LCY <br />Total job cost: <br />Haul Time: CHTime minutes <br />Return Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />%) <br />Total Res <br />( %) <br />Velocity (fpm) <br />Travel Time <br />(min) <br />Selected Number of Scrapers: <br />Adjusted single scraper team (unit) hourly production: <br />Adjusted multiple scraper team (fleet) hourly production: <br />Unadjusted unit production/hour: <br />CUUP LCY /Hour <br />Optimal Number of Scrapers per push dozer: <br />CONS <br />CRTime <br />Return Time: <br />CTSTCT <br />Total Scraper team cycle time: <br />CAJC <br />Adjusted for job conditions: <br />CSNS <br />Selected Number of Scrapers: <br />Adjusted single scraper team (unit) hourly production: <br />Adjusted multiple scraper team (fleet) hourly production: <br />Unadjusted unit production/hour: <br />CUUP LCY /Hour <br />Optimal Number of Scrapers per push dozer: <br />CONS <br />JOB TIME AND COST <br />Fleet size: CFLeet Team(s) <br />Total job time: <br />Unit cost: CUnitCost /LCY <br />Total job cost: <br />CRTime <br />minutes <br />CTSTCT <br />minutes <br />CAJC <br />LCY/Hour <br />CSNS <br />Scraper(s) <br />CASST <br />LCY/Hour <br />CAMST <br />LCY/Hour <br />CTJT Hours <br />CTJC <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.