My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-12-29_REVISION - M1978011
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1978011
>
2014-12-29_REVISION - M1978011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:51:53 PM
Creation date
1/7/2015 11:15:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978011
IBM Index Class Name
REVISION
Doc Date
12/29/2014
Doc Name
Adequacy Review- 02
From
DRMS
To
General Shale Brick, Inc.
Type & Sequence
TR1
Email Name
AME
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Worksheet Cont'd Task # TTT Page 1 of 2 <br />Task description: <br />Site: Buffalo No 1 <br />SCRAPER TEAM WORK <br />Haul Scrap Brick to Pit, 4,500 CY, 550 It <br />Permit Action: TR -01 2014 Permit /Job #: M1978011 <br />PROJECT IDENTIFICATION <br />Task #: 002 State: Colorado <br />Date: 12/24/2014 County: Elbert <br />User: AME <br />Agency or organization name <br />HOURLY EQUIPMENT <br />DRMS <br />- Scraper: Cat 637G <br />- Dozer: NA <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: NA <br />Abbreviation: None <br />Filename: MO 11-002 <br />COSTShift basis: 1 per day <br />iption <br />Cast Breakdown: Scraner Work Team Sunnort Eauinment Maintenance Eauinment <br />Total work team cost/hour: $761.00 <br />MATERIAL QUANTITIES <br />Initial volume: 4,500 CCY Swell factor: 1.000 <br />Loose volume: 4,500 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$107.02 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$239.91 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$33.56 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$380.50 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$761.00 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />Total work team cost/hour: $761.00 <br />MATERIAL QUANTITIES <br />Initial volume: 4,500 CCY Swell factor: 1.000 <br />Loose volume: 4,500 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />2,600 lbs/LCY <br />Material description: <br />Limestone - Broken <br />Rated Payload: <br />81,600 pounds <br />Payload Capacity: <br />31.38 LCY <br />Scraner Bowl (volume) Basis: <br />Struck Volume: <br />24.00 <br />LCY <br />Heaped Volume: <br />34.00 <br />LCY <br />Average Volume: <br />29.00 <br />LCY <br />Adjusted Capacity: <br />29.00 <br />LCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.