Laserfiche WebLink
Task description: Cost Su <br />Site: Buffalo No I <br />PROJECT IDENTIFICATION <br />COST SUMMARY WORK <br />Permit Action: TR -01 2014 Permit /Job #: M1978011 <br />Task #: 000 State: Colorado <br />Date: 12/24/2014 County: Elbert <br />User: AME <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: MOII -000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />005 <br />006 <br />007 <br />008 <br />Haul Product to Pit, 7,600 CY, 800 ft <br />SCRAPER1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />7.15 <br />$5,443.00 <br />$2,371.00 <br />$15,019.00 <br />$1,436.00 <br />$1,617.00 <br />$1,864.00 <br />$3,523.00 <br />$7,013.00 <br />Haul Scrap Brick to Pit, 4,500 CY, 550 ft <br />SCRAPERI <br />3.12 <br />Haul Overburden to Pit, 15,731 CY, 710 ft <br />SCRAPERI <br />14.50 <br />Rip Stockpile Area, 4.4 acres, 500 ft length <br />RIPPER <br />6.44 <br />Spread Topsoil on (North) 4.4 acres, 6 inches <br />SCRAPERI <br />2.12 <br />Spread Topsoil on (South) 4.3 acres, 6 inches <br />SCRAPERI <br />2.45 <br />Reve etation of 8.7 acres <br />REVEGE <br />34.40 <br />Mobilization/Demobilization <br />MOBILIZE <br />6.90 <br />SUBTOTALS: <br />77.08 <br />$38,286 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02% <br />Total = <br />$773.38 <br />Performance bond: 1.05% <br />Total = <br />$402.00 <br />Job superintendent: 0.00 hrs <br />Total = <br />$0.00 <br />Profit: 10.00% <br />Total = <br />$3,828.60 <br />TOTAL O & P = <br />$5,003.98 <br />CONTRACT AMOUNT (direct + O & P) = <br />$43,289.98 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal /related costs): <br />0.00 <br />Total = <br />0.00 <br />Engineering work and/or contract/bid preparation: <br />0.00% <br />Total = <br />$0.00 <br />Reclamation management and /or administration: <br />5.00% <br />$2,164.50 <br />CONTINGENCY: <br />3.00 <br />Total = <br />$1,148.58 <br />TOTAL INDIRECT COST = $8,317.06 <br />TOTAL BOND AMOUNT (direct + indirect) = $46,603.06 <br />