will be removed from the site. <br />L) Rock Dust Storage Silo: 11' diameter x 40' tall steel silo for up to 150 tons of <br />rock dust storage that will be removed from the site or cut up and sold as scrap. <br />Ml, M2) Concrete Block Retaining Walls #1 & #2: These are pre -cast concrete <br />block retaining walls used to adjust grade near the office and shop area. They will <br />be broken and buried in place or used for portal backM <br />N) Executive Offices/ Parts Warehouse/ Bath House Building: 60V x 1501 x <br />34'H steel building to contain all administrative offices, miner's changing and <br />shower facilities, and a spare parts /supplies warehouse. <br />O) Covered Storage: This 20W' x 80L' xl9'H open steel building will be of pole <br />barn style construction, with steel post uprights and stringers, covered on the roof <br />and three sides by corrugated steel. <br />p) Main Septic System Tank: This structure is a concrete tank that will be <br />broken up and left in place during reclamation. All pipes to the tank will be <br />removed and disposed of during reclamation. <br />Q) Parking Area: A 120'x175' graveled area adjacent to the Office .Building. The <br />gravel will be excavated and used for backfill at the portal area. <br />R) Fuel Storage Area: This 25W' x 45L' x2O'H steel 3 sided structure will house <br />one 2000 gallon diesel fuel tank with containments for fueling and an contained <br />area for storage of lubricants for underground and surface diesel powered <br />machines. <br />S) Main Septic System Drain Field: This structure is comprised of an <br />underground gravel field that will be left in place during reclamation. All pipes to <br />the drain field will be removed and disposed of during reclamation. <br />T) Belt Portal Structure: This concrete and steel structure will be broken and <br />used for portal backfill. <br />U) Return Portal Structure: This concrete and steel structure will be broken and <br />used for portal backfill. <br />V) Belt Portal Pump House: Concrete building used to house various pumps and <br />plumbing. This building as well as piping will broken and used for portal backfill. <br />W) Temporary Waste Rock Storage Area: This area is to be used for temporary <br />storage of underground mine waste rock waiting to be transported the refuse pile <br />at the King I mine. <br />R) Bermed Topsoil Storage #2: Stored topsoil from this open pile will be re- <br />spread on the disturbed- areas after backfiiling and grading. • The bulb of salvage <br />soil material from the site is very similar in composition and will be used for <br />backfilling and topsoil as needed. The footprint of the topsoil storage area will be <br />reseeded during re- vegetation. <br />GCC Energy, LLC King II Mine Extension PAP CO -0106 <br />Part 778 (BLM Lease COC- 62920) <br />Page 11 October 24, 2014 (RN -01) <br />