Laserfiche WebLink
778.22 Facilities or Structures Used in Common <br />"These structures and facilities will be shared by the Federal Permit <br />CO- 0106A) and the contiguous State Permit for the King II Mine (C- <br />81 -035). The anticipated surface facilities and structures at the King <br />R Mine are depicted on Map King II -OSM -007 (Operation Plan and <br />Surface Facilities). The following table identifies each. In ,general, the <br />mine facilities include the mine bench and portals, offices, <br />maintenance, and shop facilities, infrastructure for supplying power <br />and ventilation to the mine (substation, fuel tanks, water and septic <br />systems), haul and access roads, sediment control systems, stockpiles <br />for topsoil and coal products, and coal sorting and load -out <br />structures. A reclamation bond is in place for the eventual <br />reclamation of the area. <br />A) 100,000 Gallon Water Storage Tank: This steel tank will be removed from the <br />site during reclamation. Concrete bases will be broken and buried in place or <br />used for portal backfill. <br />B) 37,000 Gallon Water Storage Tank: This steel tank will be removed from the <br />site during reclamation. Concrete bases will be broken and buried in place or <br />used for portal backfill. <br />C) Pump House: Portable steel building used to house the various pumps and <br />plumbing. This building as well as piping will be removed and sold as scrap. <br />D) Shop Equipment Wash Pad: This concrete pad is used in conjunction with an <br />oil skimmer and storage tank to store equipment wash water. To be pumped by a <br />3rd party vendor. <br />E) Shop Building: 50V x 601 x 16'H steel building used for repair of various <br />mine machinery and fabrication. <br />F, I) Mine Ventilation Fan: The main mine fan will be a 7' diameter fan as part <br />of a steel structure consisting of air doors for escape purposes, explosion doors <br />which protect the fan in the event of a mine explosion, and a culvert system which <br />connects the fan to the underground workings. <br />G) Retaining Wall Adjacent to Main Fan: This wall is poured reinforced concrete <br />and is used to protect workers and equipment from material which may fall from <br />the high -wall cut above the fan portal. <br />H) Total Portal Reclaim Volume: Map King II -01OD shows a volumetric <br />calculation of fill quantities required to backfill all portals and the access road to <br />the belt /return portal area. <br />J) Travelway Portal Structure: This concrete and steel structure will be broken <br />and used for portal backfill. <br />K, VV) Motor Control Centers #1 & #2: These are portable steel buildings which <br />GCC Energy, LLC King II Mine Extension PAP CO -0106 <br />Part 778 (BLM Lease COC- 62920) <br />Page 10 October 24, 2014 (RN -01) <br />