My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-12-31_INSPECTION - M1991082
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1991082
>
2014-12-31_INSPECTION - M1991082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:56:16 PM
Creation date
1/5/2015 2:00:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1991082
IBM Index Class Name
Inspection
Doc Date
12/31/2014
Doc Name
Insp. Rpt.
From
DRMS
To
Estate of Frank Laughrey
Inspection Date
12/23/2014
Email Name
TC1
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOTOR GRADER WORK <br /> Task description: Spread Sawdust/Wood Chips <br /> Site: Tiger Timber Site Permit Action: 2014 Update Permit/Job#: M1991082 <br /> PROJECT IDENTIFICATION <br /> Task#: 003 State: Colorado Abbreviation: None <br /> Date: 12/22/2014 County: Teller Filename: M082-003 <br /> User: TC1 <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: CAT 12M Horsepower: 158 <br /> Ripper Attachment: Multi-Shank Ripper Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $26.77 NA <br /> Operating Cost/Hour: $46.43 100 <br /> Ripper Operating Cost/Hour: $2.25 100 <br /> Operator Cost/Hour: $24.47 NA <br /> Total Unit Cost/Hour: $99.92 <br /> Total Fleet Cost/Hour: $99.92 <br /> MATERIAL QUANTITIES <br /> Total Area to be graded or ripped: 4.00 acres <br /> Source of estimated acreage: Orig.App.Bond Calculation by MLRD(12/16/91) <br /> HOURLY PRODUCTION <br /> Average Grader Speed: 1.50 mph <br /> Selected Application: Ripping(0-3 mph)- 1.50 <br /> Selected Blade Angle: 30 degrees <br /> Effective Blade Length: 10.40 feet <br /> Width of blade overlap per pass: 2.00 feet <br /> Net grading or ripping width per pass: 8.40 feet <br /> Unadjusted Hourly Unit Production: 1.5273 acres/hour <br /> Job Condition Correction Factors Site Altitude: 8200 feet <br /> Source <br /> Altitude Adj: 1.00 (CAT HB) <br /> Job Efficiency: 0.90 (lsh/d,fay.) <br /> Net Correction: 0.9000 multiplier <br /> Adjusted Hourly Unit Production: 1.3745 acres/Hour <br /> Adjusted Hourly Fleet Production: 1.3745 acres/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Grader(s) Total job time: 2.91 Hours <br /> Unit cost: $72.69 per acre Total job cost: $291 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.