Laserfiche WebLink
Loader Worksheet Cont'd Task#002 Page 2 of 2 <br /> Total Travel Time: 0.3684 minutes <br /> Total Cycle Time: 0.9084 minutes <br /> Load Bucket Capacity <br /> Rated Capacity: 5.00 LCY(heaped) <br /> Bucket Fill Factor: 0.975 Sand and gravel(95%- 100%)0.975 <br /> Adjusted Capacity: 4.88 LCY <br /> Job Condition Correction Factors <br /> Site Altitude: 8200 feet <br /> Source <br /> Altitude Adj: 1.00 (CAT HB) <br /> Job Efficiency: 0.83 (1 shift/day) <br /> Net Correction: 0.83 multiplier <br /> Unadjusted Hourly Unit Production: 322.01 LCY/Hour <br /> Adjusted Hourly Unit Production: 267.27 LCY/Hour <br /> Adjusted Hourly Fleet Production: 267.27 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Loader(s) Total job time: 26.66 Hours <br /> Unit cost: $0.507 /LCY Total job cost: $3,614 <br /> CIRCES Cost Estimating Software <br />