Laserfiche WebLink
December 23, 2014 C- 1981 - 028 /Keenesburg Strip Mine JLE <br />GENERAL MINE PLAN COMPLIANCE: <br />According to Mr. Kipp, five loads of Ash were to be delivered and backfilled into the B -Pit on this day. Ash has <br />been recently placed on the north east portion of B -Pit. The excavation into the long term spoil pile was graded <br />and appeared stable. <br />REVEGETATION — Rule 4.15 <br />Vegetative Cover; Timing: <br />Parcels 31 and 30 appeared to have been mowed. <br />SUPPORT FACILITIES - Rule 4.04: <br />The facilities were observed and no problems were noted. <br />TOPSOIL — Rule 4.06 <br />Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; Redistribution 4.06.4: <br />Topsoil stockpiles B -1, A -1 and A -3 were observed. These piles are stable and vegetated. The recent excavation <br />into the B -1 and A -1 stockpiles has been graded and appear stable. <br />Topsoil has been placed on part of Parcel 32. <br />DOCUMENTS RECEIVED <br />OTHER (SPECIFY) <br />Number of Partial Inspection this Fiscal Year: 4 <br />Number of Complete Inspections this Fiscal Year: 2 <br />Page 3 of 5 <br />