My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-12-24_PERMIT FILE - M2014070
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2014070
>
2014-12-24_PERMIT FILE - M2014070
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:56:11 PM
Creation date
12/29/2014 8:47:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2014070
IBM Index Class Name
PERMIT FILE
Doc Date
12/24/2014
Doc Name
New 112c Application
From
VESCO
To
DRMS
Email Name
TAK
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GoodMiller #2 Pit 112c Permit <br />No refuse, acid or toxic producing material are expected to be encountered in this operation. If <br />these material are encountered, topsoil will be placed over the area and mining will move to a <br />different area. <br />The operator commits to clearly marking the affected area boundary with stakes surveyed on site, <br />once the permit is approved. It is planned that the material may be used to provide base material <br />for construction projects in the area. <br />Access Road <br />The site will continue to use the same haul route to CR115, which is a private road and is shown <br />on Map C -1 and Map C -2. The daily or hourly haul traffic is not increasing with the expansion of <br />the reserves. <br />Water Handling <br />Water for this site is supplied contract water haulers for dust mitigation. Potable water will be <br />supplied as bottled water. There is no water available on site for any use. <br />Schedule of Operations <br />Mining and processing will continue to operate 12 months per year. The hours of operation will <br />be 7:00 a.m. to 6:00 p.m. with administrative and maintenance functions occurring one hour prior <br />and two hours after the hours of operation, Monday through Saturday. <br />Weld County Impacts and Environmental Impacts <br />The aggregate production is estimated to be average 500,000 tons annually. Impacts to Weld <br />County include: <br />a) Truck traffic: The site will use CRl 15 to take the material to the end use locations. The daily <br />or hourly haul traffic is not increasing with the expansion of the reserves. <br />b) Noise: Vesco Consulting, LLC has operated the site under the 110c permit since 2013 and has <br />not had a noise violation. They will continue to operate the site below the state noise limits. <br />c) Dust: The processing equipment, along with the mining operation, will have air emission <br />permits in place and will ensure that these permits are accurate for the life of the operation. <br />GoodMiller #2 Pit Dec 2014 D -6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.