My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-12-24_PERMIT FILE - M2014070
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2014070
>
2014-12-24_PERMIT FILE - M2014070
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:56:11 PM
Creation date
12/29/2014 8:47:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2014070
IBM Index Class Name
PERMIT FILE
Doc Date
12/24/2014
Doc Name
New 112c Application
From
VESCO
To
DRMS
Email Name
TAK
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GoodMiller #2 Pit 112c Permit <br />weeks per year. Topsoil will be stockpiled for the initial period until the mining operation has <br />progressed far enough for reclamation to start. This is expected at the end of Mining Area 1. Once <br />areas are ready for reclamation, the stripped topsoil will be directly placed in these areas. <br />Overburden will always be directly placed because there are areas currently ready for overburden <br />placement and this will continue until the end of mining. Waste fines are generated from the <br />crushing operation and will continue to be produced. These fines will be placed on the mining <br />slopes along with the overburden to produce the 3H:1 V slopes. This quantity and cost is addressed <br />in the DRMS reclamation bond in Exhibit L. <br />Gravel Crushing Equipment <br />• Portable Jaw Crusher <br />• Portable Cone Crusher <br />• Portable Screen Decks <br />• Portable Stacking / Transporting Conveyors <br />• Water Truck for dust suppression <br />• Portable Generators for plants <br />• Electric Control Van <br />• Wheel Loader Cat 988, Cat 980 <br />• Cat D -9 size dozer or equivalent <br />Fuel Tanks <br />There will be only 1 — 2000 gallon fuel tank on site for the portable equipment on site. This tank <br />will be located near the office /trailer and its secondary containment will be a compacted earth <br />berm of 2400 gallons. <br />Additional Mining Considerations <br />Support equipment will to come to the site on an as- needed basis. The facilities area will house the <br />mine office, the shop, parts storage and a truck scale. The employee and vendor parking area will <br />also be located here. <br />There will be no blasting as part of this operation. Also, there will be no asphalt plant or concrete <br />plants on site. <br />GoodMiller #2 Pit Dec 2014 D -5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.