Laserfiche WebLink
1.07 FINAL INSPECTION <br />A. Participate in a walk - through of the site area with the Owner and Engineer. The Owner and <br />Engineer will identify and document (by means of a punch list) the additional construction items <br />required to declare the Work "substantially complete ". <br />PART 2 — PRODUCTS (NOT USED) <br />PART 3 — EXECUTION <br />3.01 GENERAL <br />A. Reclaim areas where construction work has been completed as soon as possible after completion <br />of the Work. <br />B. Grade all areas affected by construction to drain as directed by the Engineer. The maximum slope <br />steepness shall be 3H:1 V unless otherwise shown on the Drawings or approved in writing by <br />Engineer. <br />C. Eliminate uneven areas and low spots. Remove debris, roots, branches and stones in excess of 6- <br />inch size. <br />END OF SECTION <br />Wattenberg Resource Pond 3 Slurry Wall Section 02901 — Site Reclamation <br />Page 2 <br />