My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-12-24_REVISION - M2004051 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2004051
>
2014-12-24_REVISION - M2004051 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:51:53 PM
Creation date
12/29/2014 8:17:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004051
IBM Index Class Name
REVISION
Doc Date
12/24/2014
Doc Name
TR Submittal- Slurry Wall
From
Aggregate Industries
To
DRMS
Type & Sequence
TR1
Email Name
TAK
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.07 FINAL INSPECTION <br />A. Participate in a walk - through of the site area with the Owner and Engineer. The Owner and <br />Engineer will identify and document (by means of a punch list) the additional construction items <br />required to declare the Work "substantially complete ". <br />PART 2 — PRODUCTS (NOT USED) <br />PART 3 — EXECUTION <br />3.01 GENERAL <br />A. Reclaim areas where construction work has been completed as soon as possible after completion <br />of the Work. <br />B. Grade all areas affected by construction to drain as directed by the Engineer. The maximum slope <br />steepness shall be 3H:1 V unless otherwise shown on the Drawings or approved in writing by <br />Engineer. <br />C. Eliminate uneven areas and low spots. Remove debris, roots, branches and stones in excess of 6- <br />inch size. <br />END OF SECTION <br />Wattenberg Resource Pond 3 Slurry Wall Section 02901 — Site Reclamation <br />Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.