Laserfiche WebLink
DIVISION 2 - SITE WORK <br />SECTION 02901— SITE RECLAMATION <br />PART 1— GENERAL <br />1.01 WORK INCLUDED <br />A. This section includes cleanup, stabilization and reclamation of disturbed areas within the Limits of <br />Site Disturbance. <br />1.02 SUBMITTALS <br />A. Administrative: Written request for a final inspection <br />1.03 CLEANUP <br />A. Perform cleanup concurrent with the progress of construction. <br />B. Remove all mud, soil - bentonite backfill and slurry, oil, grease, soil, gravel, trash, scrap, debris, <br />and excess materials that are unsightly or may impact vehicular or personnel travel around the site. <br />C. Complete cleanup prior to submitting written request for a final inspection. <br />D. Remove from the site all trash, debris, and surplus material. <br />1.04 PROTECTION <br />A. Protect areas outside Limits of Site Disturbance from disturbance. <br />1.05 RECLAMATION AND STABILIZATION <br />A. Complete reclamation and stabilization concurrent with the progress of construction. Disassemble <br />and remove all temporary construction facilities. Leave the site in an orderly and reclaimed <br />condition. <br />B. Permanent signs, markers, and fences shall be preserved and maintained in their existing locations <br />and condition unless written permission is obtained from the Owner for their removal and <br />restoration or replacement. Any signs, markers or fences which are approved for removal shall be <br />removed when grading operations begin and shall be stored in a manner to keep them clean and in <br />their existing condition. Damaged items shall be repaired or replaced. <br />1.06 DISPOSAL OF WASTE AND EXCESS MATERIALS <br />A. All excess construction materials shall be removed from the site. <br />B. Dispose of construction waste in a licensed disposal facility in accordance with appropriate <br />county, state, and federal regulations. <br />C. Excess bentonite slurry and soil - bentonite backfill can be disposed of at the location designated by <br />the Owner. <br />Wattenberg Resource Pond 3 Slurry Wall Section 02901— Site Reclamation <br />Page 1 <br />