Laserfiche WebLink
DIVISION 2 - SITE WORK <br />SECTION 02100 - SITE PREPARATION <br />PART1- GENERAL <br />1.01 WORK INCLUDED <br />Clearing trees, brush, and other vegetation from the slurry wall alignment and stripping upper soil layer to <br />prepare for placement of new earthen fill. <br />1.02 RELATED WORK <br />Section 02168 — Slurry Wall Construction <br />Section 02290 - Fill Area Construction <br />PART 2 - NOT USED <br />PART 3 - EXECUTION <br />3.01 GENERAL <br />The Contractor shall, by their own investigation, determine the extent and effort of clearing required in <br />accordance with this section. <br />3.02 CLEARING AND GRUBBING <br />Clearing of the ground surface along the slurry wall alignment and in fill areas will be at the direction of <br />the Engineer. The area to be occupied by the permanent construction required under these specifications <br />and the surfaces of all borrow pits, stockpiles, and fill areas shall be cleared of all trees, stumps, exposed <br />roots, brush, rubbish, and other objectionable matter as determined by the Engineer. <br />3.03 STRIPPING <br />The fill areas shall be stripped to a depth of 6 inches or to a sufficient depth, as determined by the Engineer, <br />to remove all unsuitable materials. The unsuitable materials to be removed by stripping shall include all <br />surface boulders and loose rock, debris, topsoil, vegetable matter, including stumps and roots, and all other <br />perishable and objectionable materials that are unsuitable for use in permanent construction required under <br />these specifications or that might interfere with the proper bonding of the embankment with the foundation, <br />or the proper compaction of the fill materials, or that may be otherwise objectionable as determined by the <br />Engineer. <br />3.04 DISPOSAL <br />Materials from clearing operations shall be removed from the construction site or otherwise disposed of as <br />approved by the Engineer. <br />Waste piles shall be located where they will not interfere harmfully with the natural flow of the stream and <br />drainage channels, with construction operations in the borrow areas, or with the operation of the reservoir. <br />Waste piles shall be leveled and trimmed to reasonable regular lines. <br />END OF SECTION <br />Wattenberg Resource Pond 3 Slurry Wall Section 02100 — Site Preparation <br />Page 1 <br />