Laserfiche WebLink
DIVISION 2 - SITE WORK <br />SECTION 02010 — SUBSURFACE EXPLORATION <br />1.01 GENERAL <br />A. Summary <br />Related Sections: <br />Section 02100 — Site Preparation <br />Section 02168 — Slurry Wall Construction <br />Section 02200 — General Earthwork <br />B. Description Of Work <br />1. Borings were previously drilled in the area. Approximate boring locations and boring <br />logs are included with the construction plans. <br />C. Interpretation <br />Borings were drilled at the approximate locations shown to obtain generalized subsurface <br />information in accordance with generally accepted engineering practices. Soil conditions <br />between borings may differ. If soil conditions differ, the ENGINEER shall be notified. <br />D. Examine Site <br />Contractors will examine the site before submitting proposal and decide for themselves <br />the character of materials to be encountered and all conditions which will affect work, <br />time and costs. <br />END OF SECTION <br />Wattenberg Resource Pond 3 Slurry Wall Section 02010 — Subsurface Exploration <br />Page 1 <br />