Laserfiche WebLink
TABLE C -1 (Continuted) <br />Bentonite Slur at Ixing po nd <br />Bentonite Slur at trench <br />Notes <br />Test <br />Location <br />eta. <br />Date <br />Technician <br />Marsh <br />Funnel <br />Viscosity <br />sec <br />Unit <br />Weight <br />Filtrate <br />Loss <br />ml <br />Cake <br />Thickness <br />ml <br />H <br />Marsh <br />Funnel <br />Viscosity <br />sec <br />Unit <br />Weight <br />Filtrate <br />Loss <br />ml <br />Sand <br />Content <br />vol % <br />Cake <br />Thickness <br />in <br />4/19/2013 <br />Deuto <br />48.9 <br />74.00 <br />Retest offailing results <br />40+00 <br />4/20/2013 <br />Ladwig <br />43 <br />66.00 <br />13.0 <br />9 <br />102 <br />failing, cleaned out slurry. Filled with fresh <br />40+00 <br />4/20/2013 <br />Ladwig <br />48 <br />80.00 <br />14.5 <br />24 <br />am retest <br />38 +80 <br />4/202013 <br />Ladwig <br />43 <br />65.50 <br />44 <br />78.00 <br />Pro test <br />37+90 <br />4212013 <br />Ladwig <br />40 <br />65.00 <br />13.0 <br />9 <br />41 <br />77.00 <br />16.6 <br />15 <br />am test. Half day of work No pm tests <br />37 +30 <br />4222013 <br />Deuto <br />40 <br />65.50 <br />9 <br />41 <br />76.50 <br />25.0 <br />16 <br />am test. Half da of work No pm tests <br />36+00 <br />4/242013 <br />Deuto <br />56.3 <br />67.00 <br />13.0 <br />9 <br />41.2 <br />65.70 <br />12.2 <br />3 <br />am test <br />43+90 <br />424 /2013 <br />Deuto <br />41.1 <br />65.00 <br />44 <br />69.00 <br />Pro test <br />34 +20 <br />4252013 <br />Ladwig <br />44.2 <br />65.00 <br />9 <br />41 <br />67.00 <br />14.9 <br />4 <br />am test <br />35 +70 <br />4252013 <br />Ladwig <br />41 <br />74.00 <br />47 <br />65.00 <br />Pro test <br />31 +70 <br />4/262013 <br />Ladwig <br />42.8 <br />65.00 <br />13.4 <br />9 <br />47 <br />67.00 <br />12.2 <br />4.5 <br />am test <br />31 +10 <br />4262013 <br />Ladwig <br />40.3 <br />65.00 <br />43.1 <br />76.00 <br />prn test <br />30+30 <br />4272013 <br />Ladwig <br />43 <br />65.00 <br />9 <br />44.3 <br />71.00 <br />11.6 <br />9 <br />am test <br />29 +30 <br />4272013 <br />Ladwig <br />41.4 <br />65.00 <br />43.6 <br />74.00 <br />pot test <br />28 +50 <br />4292013 <br />Deuto <br />44.1 <br />65.00 <br />13.0 <br />9 <br />43.6 <br />67.00 <br />11.6 <br />3 <br />am test <br />27 +20 <br />4292013 <br />Deuto <br />40 <br />65.00 <br />40 <br />75.00 <br />pm test <br />26 +30 <br />4/302013 <br />Deuto <br />47.3 <br />66.00 <br />15.8 <br />9 <br />52.6 <br />69.00 <br />10.8 <br />5 <br />am test <br />25 +10 <br />4/302013 <br />Deuto <br />47.9 <br />66.00 <br />48.4 <br />82.00 <br />20 <br />pro, test <br />26 +20 <br />5/12013 <br />Deuto <br />53 <br />66.00 <br />12.6 <br />9 <br />1 45.4 <br />67.50 <br />24.2 <br />am test <br />25+90 <br />5/12013 <br />Deuto <br />41 <br />64.00 <br />44.7 <br />83.00 <br />20 <br />pm test <br />22 +70 <br />522013 <br />Deuto <br />42.6 <br />64.50 <br />15.2 <br />9 <br />46.5 <br />82.00 <br />12.0 <br />21 <br />am test <br />22 +50 <br />522013 <br />Ladwig <br />41 <br />65.00 <br />44.3 <br />76.00 <br />prn test <br />22+00 <br />5/32013 <br />Iadwig <br />43.6 <br />65.50 <br />13.0 <br />9 <br />51.1 <br />96.00 <br />19.2 <br />32 <br />am test, trench too sandy, will excanged slurry and retest. <br />22+00 <br />5/32013 <br />Ladwig <br />44.5 <br />78.50 <br />14 <br />retest of am trench after shiny was replaced <br />19+70 <br />5/32013 <br />Ladwig <br />41 <br />65.50 <br />1 <br />45 <br />87.00 <br />24 <br />put test,'Sluny adjusted to reduce sand content <br />19 +50 <br />5/42013 <br />Ladwig <br />44.4 <br />65.50 <br />NA <br />9 <br />45 <br />76.00 <br />13.2 <br />20 <br />am test, sand in trench adjusted by removing slurry and replace. <br />17 +80 <br />5/42013 <br />Ladwig <br />40.2 <br />65.00 <br />42 <br />76.00 <br />pro test <br />17+60 <br />5/6/2013 <br />Deuto <br />45 <br />65.00 <br />NA <br />9 <br />42 <br />70.00 <br />15.4 <br />am test <br />16+40 <br />5/62013 <br />Deuto <br />42 <br />67.00 <br />43 <br />77.00 <br />13 <br />pro, test, sand taken pro <br />15 +50 <br />5/72013 <br />Deuto <br />43.7 <br />67.00 <br />13.6 <br />9 <br />46 <br />71.00 <br />11.4 <br />8 <br />am test <br />13 +70 <br />5/72013 <br />Deuto <br />32 <br />put test, sand taken pm and failed <br />13+40 <br />5/72013 <br />Deuto <br />46 <br />64.00 <br />47 <br />86.00 <br />22 <br />Restest of thinned out slurry <br />13 +30 <br />5/82013 <br />Deuto <br />53 <br />66.00 <br />13.0 <br />9 <br />49.4 <br />82.00 <br />13.5 <br />20 <br />am test <br />11+90 <br />5/82013 <br />Deuto <br />37 <br />52.3 <br />97.00 <br />25 <br />pm test, retrest of out of spec trench 5 -9 -13, dire to lightning <br />11+90 <br />5/82013 <br />Deuto <br />44 <br />65.00 <br />pro, test, retest of pond sample <br />11 +20 <br />5/92013 <br />Deuto <br />49 <br />65.50 1 <br />11.0 <br />9 <br />46 <br />75.00 <br />11.5 <br />16 <br />am test <br />10+40 <br />5/92013 <br />Ladwig <br />52 <br />65.00 <br />44 <br />83.00 <br />pm test <br />10+10 <br />5/102013 <br />Iadwig <br />42.6 <br />65.50 <br />13.7 <br />9 <br />53 <br />76.00 <br />16.0 <br />12 <br />am test., had to adjust slurry due to high sand prior to this test <br />08+90 <br />5/102013 <br />Ladwig <br />42.2 <br />65.50 <br />49 <br />87.00 <br />pm test <br />08+00 <br />5/112013 <br />Ladwig <br />42.2 <br />66.00 <br />13.0 <br />9 <br />49 <br />73.00 <br />12.2 <br />16 <br />am test, stopped for repairs to the big stick <br />07+40 <br />5/132013 <br />Deuto <br />37 <br />48 <br />87.00 <br />12.4 <br />>25 <br />am test <br />07 +10 <br />5/132013 <br />Deuto <br />44 <br />66.00 <br />13.0 <br />9 <br />23 <br />am retests <br />05+90 <br />5/132013 <br />Deuto <br />43.8 <br />65.00 <br />37.5 <br />23 <br />pm test <br />05+60 <br />5/132013 <br />Deuto <br />44.3 <br />85.00 <br />pm retest <br />05+60 <br />5/142013 <br />1 Deuto <br />1 40 <br />66.00 <br />13.5 <br />9 <br />45 <br />81.00 <br />13.3 <br />23 <br />am test <br />