Laserfiche WebLink
TABLE C -1 <br />AGGREGATE INDUSTRIES <br />WATTENBERG POND 3 SLURRY WALL <br />BENTONITE SLURRY TEST SUMMARY <br />Bentonite Slur at Ixing po nd <br />Bentonite Slurry t trench <br />Notes <br />Test <br />Location <br />sta. <br />Date <br />Technician <br />Marsh <br />Funnel <br />Viscosity <br />sec <br />Unit <br />Weight <br />Filtrate <br />Loss <br />ml <br />Cake <br />Thickness <br />in <br />H <br />Marsh <br />Funnel <br />Viscosity <br />sec <br />Unit <br />Weight <br />Filtrate <br />Loss <br />ml <br />Sand <br />Content <br />Vol % <br />Cake <br />Thickness <br />in <br />48 +77 <br />3/14/2013 <br />Ladwi <br />41.5 <br />65.00 <br />14.8 <br />9.00 <br />40 <br />67.50 <br />18.0 <br />4 <br />48 +80 <br />3/15/2013 <br />Ladwia <br />1 42 <br />65.00 <br />15.5 <br />8 <br />41.2 <br />67.00 <br />15.0 <br />4 <br />am test <br />48 +80 <br />3/15/2013 <br />Ladwig <br />40 <br />65.00 <br />15.5 <br />10:30 am additional test <br />48+90 <br />3/15/2013 <br />Ladwig <br />33 <br />65.00 <br />40 <br />68.00 <br />48+90 <br />3/15/2013 <br />Ladwig <br />40.04 <br />Retest of Pond viscosity <br />49 +30 <br />3/16 /2013 <br />del Monte <br />42 <br />64.50 <br />15.0 <br />9 <br />41 <br />62.25 <br />15.4 <br />4 <br />47+40 <br />3/16 /2013 <br />del Monte <br />40.7 <br />65.00 <br />1 40.8 <br />72.00 <br />am test <br />3/18 /2013 <br />Ladwig <br />43 <br />65.00 <br />15.0 <br />9 <br />49 <br />71.50 <br />12.0 <br />8 <br />pm test <br />48 +70 <br />3/19 /2013 <br />Ladwig <br />39 <br />65.50 <br />13.5 <br />48 <br />71.00 <br />13.0 <br />6 <br />added 1 bag of Bentonite at pond to increase viscosity <br />48 +70 <br />3/19 /2013 <br />Ladwig <br />40 <br />Retest of pond viscocity <br />3/20 /2013 <br />Ladwig <br />40 <br />65.00 <br />16.4 <br />8 <br />46 <br />71.00 <br />13.4 <br />9 <br />am test - no active work occurring <br />47 +30 <br />3 /22/2013 <br />Deuto <br />40.2 <br />65.00 <br />8.5 <br />46 <br />73.00 <br />10 <br />am test <br />3 /22 /2013 <br />Deuto <br />40.6 <br />66.00 <br />44 <br />69.00 <br />pm test <br />49 +20 <br />4/2 /2013 <br />Deuto <br />38.75 <br />44.6 <br />65.00 <br />16.8 <br />l <br />am test <br />4 /2/2013 <br />Deuto <br />42 <br />65.00 <br />16.4 <br />9 <br />Retest of pond viscocity, after recirculation <br />48+90 <br />4 /2/2013 <br />Deuto <br />40.1 <br />64.00 <br />43.6 <br />69.00 <br />pm test, due to low viscosity and unit wt, Ken asking to <br />increase bentonite in slurry <br />50+40 <br />4/3 /2013 <br />Deuto <br />40.5 <br />65.00 <br />9 <br />43.8 <br />74.00 <br />12.6 <br />12 <br />am test <br />51 +20 <br />4/3 /2013 <br />Deuto <br />41.3 <br />64.50 <br />44.2 <br />70.00 <br />pm test <br />46+00 <br />4/4 /2013 <br />Deuto <br />48.2 <br />65.00 <br />9 <br />1 46.4 <br />81.00 <br />13.0 <br />20 <br />am test <br />46 +80 <br />4/4 /2013 <br />Ladwig <br />1 41.5 <br />65.00 <br />42 <br />74.50 <br />pm test <br />44 +50 <br />4/5 /2013 <br />Deuto <br />44.5 <br />65.00 <br />14.0 <br />9.5 <br />38 <br />am test <br />44 +50 <br />4/5 /2013 <br />Deuto <br />43 <br />77.00 <br />13.8 <br />10 <br />Retest oftrench am test <br />43 +30 <br />4/5 /2013 <br />Deuto <br />43 <br />65.00 <br />44.5 <br />83.50 <br />pot test <br />42 +70 <br />4/6 /2013 <br />Ladwig <br />43 <br />65.00 <br />14.0 <br />9 <br />43 <br />75.00 <br />13.0 <br />15 <br />am test <br />41 +50 <br />4/6 /2013 <br />Ladwig <br />41 <br />65.00 <br />45 <br />80.00 <br />pm test <br />51+60 <br />4/8 /2013 <br />Deuto <br />42.9 <br />65.00 <br />1 <br />9.5 <br />40.6 <br />69.00 <br />12.2 <br />5 <br />am test <br />52+90 <br />4/8 /2013 <br />Deuto <br />1 45.8 <br />65.00 <br />41.3 <br />71.00 <br />prn test <br />53 +50 <br />4/11/2013 <br />Deuto <br />44.3 <br />65.00 <br />17.0 <br />9 <br />42.4 <br />82.00 <br />15.4 <br />20 <br />am test <br />54 +30 <br />4/11 /2013 <br />Deuto <br />42.1 <br />66.00 <br />42.3 <br />77.00 <br />pm test <br />54 +70 <br />4/12 /2013 <br />Deuto <br />42.5 <br />65.50 <br />14.3 <br />8.5 <br />43 <br />75.00 <br />15.0 <br />17 <br />am test <br />56 +10 <br />4/12 /2013 <br />Deuto <br />41 <br />65.50 <br />47.6 <br />85.50 <br />pm test <br />56 +70 <br />4/13 /2013 <br />Ladwig <br />21.0 <br />9 <br />57 +50 <br />4/13 /2013 <br />Ladwig <br />41 <br />64.50 <br />1 <br />66 <br />41.00 <br />pm test <br />4/14 /2013 <br />Ladwig <br />78 <br />45.00 <br />21.3 <br />19 <br />am test <br />59 +20 <br />4/15 /2013 <br />Deuto <br />40 <br />65.00 <br />14.4 <br />9 <br />33.5 <br />am test <br />4/15 /2013 <br />Deuto <br />77.5 <br />40.00 <br />24.2 <br />20 <br />am retest <br />60+00 <br />1 4/15 /2013 <br />Deuto <br />43.6 <br />64.50 <br />1 <br />90 <br />47.00 <br />-30 <br />pm test - Unit wt fail and sand fail. Contractor addressing at en <br />of shift <br />60+30 <br />4/19 /2013 <br />Deuto <br />47 <br />66.00 <br />12.1 <br />9 <br />44.8 <br />1 68.00 <br />1 13.3 <br />4 <br />am test <br />1 <br />43+00 <br />4/19 /2013 <br />1 Deuto <br />1 43.2 <br />64.00 <br />1 <br />63 <br />1 103.00 <br />1 <br />pm test <br />