Laserfiche WebLink
6 (FORM 2 -Public filing) <br /> 8. Describe the estimated topsoil depth and how topsoil will be salvaged,stockpiled and redistributed for the re-establishment of <br /> vegetation. Specify approximate topsoil redistribution depth: <br /> 0-4" depth topsoil layer will be stored onsite and stockpiles will be seeded if <br /> stored more than 1 year. Will be distributed evenly to disturbed areas upon <br /> reclamation. <br /> 9. Describe how drill holes will be plugged(refer to Rule 5.4 of the Rules for required abandonment procedures): <br /> Exploration drill holes will be grouted full <br /> depth. <br /> 10. Describe how portals,adits,shafts,ponds,excavations,or other disturbances will be reclaimed(refer to Rule 3 and Rule 5 for <br /> specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br /> Excavations, cuts, and pits will be filled and recovered with topsoil. The area <br /> will a recontoured as needed an <br /> reseeded. <br /> 11. Describe how roads will be reclaimed or returned to their pre-prospecting(or better)condition: <br /> All roads are existing and are to remain after <br /> reclamation. <br />