Laserfiche WebLink
5 (FORM 2 -Public filing) <br /> G. Total project area to be disturbed 1.20 (acres) <br /> K. Describe the equipment to be used for the prospecting operations: <br /> Front-end loaders and <br /> backhoes <br /> L. Describe and locate any structures to be constructed(i.e. stockpiles,ponds,impoundments): <br /> All stockpiles will be directly adjacent to the excavations within the NOI <br /> area. <br /> M. Describe anticipated relationship to surface water and groundwater(proximity to streams,penetration of ground <br /> water aquifers): <br /> No groundwater is expected. Surface water runoff is minimal due to the <br /> location of this claim along a ridge. Ephemeral streams are approx. 500 ft <br /> east and 300 ft west. <br /> IV. OPERATION AND RECLAMATION MEASURES: <br /> I. The Board suggests that a photographic record of the pre-prospecting and post-prospecting conditions be kept by the <br /> prospector. These photos should be taken from the same location and by the same method to clearly show the pre-prospecting <br /> condition of the land and the reclamation efforts. Upon completion of reclamation and request for bond or surety release,the <br /> Board may consider the photos as evidence of adequate reclamation, and thus,be able to act more quickly on the request for <br /> release. <br /> 2. Provide a description of the native vegetation of the area to be disturbed, including tree, shrub,and grass communities of the <br /> area. Color photographs, sufficient to adequately represent the ecology of the site and adequately labeled (including date, <br /> orientation and location),may be used in lieu of a written description. Based on the quality of the photographs,the Division <br /> may require additional detail. <br /> Rocky Mountain Douglas Fir/White Fir Forest with common juniper and scrub <br /> oak. <br />