My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-12-17_GENERAL DOCUMENTS - M2008001
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M2008001
>
2014-12-17_GENERAL DOCUMENTS - M2008001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:56:02 PM
Creation date
12/19/2014 7:51:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008001
IBM Index Class Name
General Documents
Doc Date
12/17/2014
Doc Name
Admin. Review of Special Use Permit
From
Pueblo County
To
Southwest Farms, Inc.
Permit Index Doc Type
General Correspondence
Email Name
TOD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
John Sliman, Southwest Farms, Inc. <br /> Re: PCPC/Administrative Review of Special Use Permit No.2006-020 <br /> December 17, 2014 <br /> Page Two <br /> • Mined Land Reclamation Board Permit <br /> • Water Quality Control Division - Stormwater Discharge Permit <br /> • Pueblo County Department of Public Works—Access Permit <br /> • Colorado Department of Transportation (CDOT) —Access Permit <br /> The applicant shall provide to the Department of Planning and Development a copy of all <br /> other required Federal, State, and local permit applications, approvals, amendments, <br /> waivers, or releases (e.g., air quality, MLRB, etc.) pertaining to Special Use Permit No. <br /> 2006-020 within 30 days of their submittal to the respective agency, and approval by the <br /> respective agency. <br /> 4. The applicant shall file with the Department of Planning and Development an annual <br /> mining operation and reclamation activities report that addresses compliance with the <br /> conditions of this Special Use Permit. Said report shall be submitted by the first day of <br /> the anniversary month of the approval date of this Special Use Permit. <br /> 5. The applicant shall develop, operate, and manage the mining-related activity according <br /> to the rules, regulations, plans, and permits administered by the applicable Federal, <br /> State, and local agencies. Any violation of a rule, regulation, permit, or plan may result <br /> in the scheduling of a Show Cause Hearing to consider the revocation of Special Use <br /> Permit No. 2006-020. <br /> PUBLIC WORKS' RECOMMENDED CONDITIONS OF APPROVAL <br /> 1. The haul route from the Stage 2 site shall be limited to 39th Lane to State Highway 96. <br /> 2. The applicant shall apply to the Pueblo County Public Works for an access permit for <br /> their proposed Stage 2 access point onto 39th Lane. All conditions associated with said <br /> permit shall be complied with prior to commencing operation of the pit. An approved <br /> access permit shall be deemed as compliance with this condition. <br /> 3. The applicant shall provide a CDOT access permit application to Pueblo County Public <br /> Works for signature as permittee for the access point onto State Highway 96 for 391h <br /> Lane. All conditions associated with said permit shall be complied with prior to <br /> commencing operation of the pit. All costs, including design and construction associated <br /> with the permit, will be solely borne by the special use permit applicant. An approved <br /> access permit shall be deemed as compliance with this condition. <br /> DIRECTIVE TO STAFF: The Department of Planning and Development is directed to <br /> conduct an administrative review of the property before the regularly scheduled December, <br /> 2015 Planning Commission meeting and to present a report to the Pueblo County Planning <br /> Commission at its December, 2015 meeting. If the use is not established and/or the <br /> property is not in full compliance with the Pueblo County Code and/or all of the conditions of <br /> approval, the Commission may, at its discretion, direct staff to schedule the permit for a <br /> public hearing at the January, 2016 meeting. The Commission, at its discretion, may also <br /> direct staff to conduct an administrative review and/or schedule the permit for public hearing <br /> at an earlier date, if deemed necessary. <br />
The URL can be used to link to this page
Your browser does not support the video tag.