My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-12-12_REVISION - C2010089 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2010089
>
2014-12-12_REVISION - C2010089 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:55:58 PM
Creation date
12/18/2014 10:56:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
Revision
Doc Date
12/12/2014
Doc Name
Review Comments
From
Susan Burgmaier
To
Brock Bowles
Type & Sequence
MT1
Email Name
SLB
BFB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 151 <br />COST SUMMARY WORK <br />Task description: Cost Summary 2014 Midterm Review <br />Permit Action: 2014 Midterm <br />Site: New Horizon North Mine Review (MT -1) Permit/Job #: C2010089 <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 12/12/2014 County: Montrose <br />User: SLB <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: C089 -000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />005 <br />010 <br />011 <br />012 <br />013 <br />014 <br />015 <br />020 <br />021 <br />022 <br />023 <br />030 <br />031 <br />032 <br />040 <br />041 <br />042 <br />043 <br />044 <br />045 <br />046 <br />047 <br />048 <br />049 <br />055 <br />056 <br />057 <br />058 <br />059 <br />060 <br />061 <br />062 <br />Drill and Shoot Highwall <br />BLASTING <br />1 <br />1 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />2 <br />1 <br />1 <br />147.81 <br />$56,834.00 <br />$1,700,740.00 <br />$1,315,945.00 <br />$10,149.00 <br />$5,976.00 <br />$6,385.00 <br />$4,193.00 <br />$6,354.00 <br />$1,946.00 <br />$4,462.00 <br />$151,656.00 <br />$16,976.00 <br />$25,753.00 <br />$7,861.00 <br />$31,589.00 <br />$6,098.00 <br />$685.00 <br />$1,172.00 <br />$7,880.00 <br />$10,594.00 <br />$6,769.00 <br />$993.00 <br />$172.00 <br />$904.00 <br />$306.00 <br />$471.00 <br />$768.00 <br />$145,440.00 <br />$27,108.00 <br />$37,091.00 <br />$37,091.00 <br />$53,177.00 <br />$8,604.00 <br />$2,131.00 <br />$15,908.00 <br />$6,667.00 <br />Backfill Final Pit with Overburden Stockpile <br />TRUCKI <br />795.18 <br />Regrade Trailing Spoil Ridges <br />DOZER <br />1,264.64 <br />Regrade Facilities Area <br />DOZER <br />9.75 <br />Regrade Overburden Stockpile Area <br />DOZER <br />5.74 <br />Rip Facilities Area <br />RIPPER <br />5.76 <br />Rip West Haul Road <br />RIPPER <br />3.78 <br />Rip East Haul Road <br />RIPPER <br />5.73 <br />Rip Northwest Haul Road <br />RIPPER <br />1.75 <br />Rip Equipment Corridor Road <br />RIPPER <br />4.02 <br />Rip All Topsoil Replacement Areas Prior to <br />Reseeding <br />RIPPER <br />136.96 <br />Regrade West Haul Road <br />DOZER <br />16.31 <br />Regrade East Haul Road <br />DOZER <br />24.75 <br />Regrade Northwest Haul Road <br />DOZER <br />7.55 <br />Regrade Equipment Corridor Road <br />DOZER <br />30.36 <br />Finish Grade Pit Areas <br />GRADER <br />44.71 <br />Finish Grade Facilities Area <br />GRADER <br />5.02 <br />Finish Grade Overburden Stockpile Area <br />GRADER <br />8.59 <br />Regrade Pond NHN -001 <br />DOZER <br />29.79 <br />Regrade Pond NHN -002 <br />DOZER <br />40.05 <br />Regrade Pond NHN -003 <br />DOZER <br />25.59 <br />Regrade Ditch NHN -001 East <br />DOZER <br />3.75 <br />Regrade Ditch NHN -001 West <br />DOZER <br />0.65 <br />Regrade Ditch NHN -002 North <br />DOZER <br />3.42 <br />Regrade Ditch NHN -002 South <br />DOZER <br />1.16 <br />Regrade Ditch NHN -003 North <br />DOZER <br />1.78 <br />Regrade Ditch NHN -003 South <br />DOZER <br />2.91 <br />Reconstruct 2nd Park Lateral Ditch <br />NA <br />105.88 <br />Replace Topsoil from Stockpile to 2013 Pit Area <br />TRUCKI <br />14.97 <br />Replace Topsoil from Stockpile to 2014 Pit Area <br />TRUCKI <br />17.34 <br />Replace Topsoil from Stockpile to 2015 Pit Area <br />TRUCKI <br />17.34 <br />Replace Topsoil from Stockpile to 2016 Pit Area <br />TRUCKI <br />24.86 <br />Replace Topsoil from Stockpile to Facilities Area <br />TRUCKI <br />4.75 <br />Replace Topsoil from Stockpile to Topsoil <br />Stockpile Area <br />DOZER <br />2.05 <br />Replace Topsoil from Stockpile Overburden <br />Stockpile Are <br />TRUCKI <br />8.78 <br />Replace Topsoil from Stockpile to West Haul Road <br />TRUCKI <br />3.12 <br />C1RCES Cost Estanatmg Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.