Laserfiche WebLink
Materials consistency <br />description: <br />Avera eg_push <br />gradient: <br />Average site altitude: <br />0% <br />5,000 feet <br />Consolidated stockpile 1.0 <br />Material weight: 2,100 lbs /LCY <br />Weight description: <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade tyke: <br />Net correction: <br />Adjusted unit <br />production: <br />Adjusted fleet <br />production: <br />Earth - Loam <br />Job Condition Correction Factor Source <br />0.750 <br />A( VG.) <br />1.000 <br />CAT HB <br />1.000 <br />GEN. <br />1.000 <br />A( VG.� <br />0.830 <br />(1 SHIFT /DAY) <br />0.800 <br />FND -RF <br />1.000 <br />CAT HB <br />1.000 <br />tCALHBI <br />1.095 <br />CAT HB <br />1.000 <br />PAT <br />0.5453 <br />1,565.17 LCY/hr <br />3130.34 LCY /hr <br />JOB TIME AND COST <br />Fleet size: 2 DO zer US <br />Unit cost: $0.332/LCY <br />Total job time: 2.05 Hours <br />Total job cost: $2,131 <br />Page 77 of 151 <br />CIRCES Cost Estimating Software <br />