Laserfiche WebLink
Page 76 of 151 <br />BULLDOZER WORK <br />Task description: Replace Topsoil from Stockpile to Topsoil Stockpile Area <br />New Horizon North Permit Action: <br />Site: Mine <br />7 n 1 d T%4; A+Pr <br />Review MT -1) Permit /Job#: C2010089 <br />PROJECT IDENTIFICATION <br />Task 9: 060 State: Colorado Abbreviation: None <br />Date: 12/12/2014 County: Montrose Filename: C089 -060 <br />User: SLB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D11R - l lU <br />Horsepower: <br />850 <br />Blade Tyke: <br />Universal <br />Attachment: <br />NA <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Utilization % <br />Ownership $173.50 NA <br />Cost/Hour: <br />Operating Cost/Hour: $308.78 100 <br />Ripper op. $0.00 0 <br />Cost /Hour: <br />Operator Cost/Hour: $38.01 NA <br />Total unit Cost /Hour: $520.29 <br />Total Fleet $1,040.57 <br />Cost /Hour: <br />MATERIAL QUANTITIES <br />Initial Volume: 5,750 <br />Swell factor: 1.115 <br />Loose volume: 6,411 LCY <br />Source of estimated volume: Map 2.05.3(3) -3 <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: 100 feet <br />Unadjusted hourly 2,870.3 LCY/hr <br />production: <br />CIRCES Cost Estimating Software <br />