Laserfiche WebLink
ENVIRONMENT, INC. PAGE 2 <br /> DECEMBER 1 2, 2014 <br /> Mining Plan Map shows that but the scale is such that a couple of feet here or <br /> there, is not decipherable. Figure 6 cross-section A in the attached report shows <br /> the setback distances and the safety factors for each. <br /> 3. The Applicant did not specify an offset and mining slope for the north and east side of Phase <br /> 1. Please provide the proposed Phase I north and east side offset and mining slope. <br /> Mining in Phase 1 will begin 10 feet inside the slurry wall on the north and east sides <br /> and a I to 1 working face will be used. <br /> 4. The Applicant did not specify an offset and mining slope for the west side of Phase 2.Please <br /> provide the proposed Phase 2 west side offset and mining slope. <br /> Mining in Phase 2 will begin 10 feet inside the slurry wall along the west side and a <br /> to 1 working face will be used. <br /> 5. Please update the Geotechnical Stability Exhibit for the north,east and south sides of the mine <br /> to include the proposed slurry wall and anticipated hydrostatic level. <br /> 5tability analyses were performed using DRMS recommended strength parameters <br /> for the north, south, east and west sides of the Hatchery Pit. The anticipated <br /> hydrostatic groundwater level was estimated for this analysis based on information <br /> collected during the geotechnical investigation performed at the site in 2013. No <br /> groundwater modeling was performed for these analyses. <br /> 6.The Applicant did not provide a typical soil profile description or illustration.Please provide a <br /> typical soil profile for the stability analyses. <br /> The typical soil profile was based on borehole information collected during the <br /> geotechnical investigation perform in 2013. Testing of engineering properties was <br /> not performed on the samples collected. The slope stability analysis used strength <br /> values recommended by the DRMS. Bore logs are included in this response. <br /> 7. Please provide geotechnical borehole data,if available, for the site for Division review. <br /> The 2013 bore logs are included in this response as well as the 2007 logs_ <br /> 8. Please provide any soil property lab data,if available,for the site for Division review. <br /> We do not have this data. <br /> 9.Please provide a geotechnical stability analysis for the Phase 1 excavation being used as a <br /> sediment pond during the mining operations in Phase 2. <br />