MINING PLAN EXHIBIT D(CONT) <br /> IN STAGE 1 THE MINING WILL BE 10 FEET INSIDE THE SLURRY WALL ON EAST AND NORTH <br /> SIDES. ALONG THE WEST SIDE IT WILL BE A MINIMUM OF 200 FEET FROM THE THORNTON <br /> SLURRY WALL/DAM STRUCTURE AND ON THE SOUTH SIDE IT WILL BE 42 FROM THE PERMIT <br /> LINE OR 10 FEET INSIDE THE SLURRY WALL . IN STAGE 2 ALONG THE NORTH AND SOUTH <br /> THE SETBACK WILL BE A MINIMUM OF 25 FEET AND ON THE EAST SIDE IT WILL BE 50 <br /> FEET FROM THE PERMIT LINES . ON THE WEST SIDE IT WILL BE 10 FEET INSIDE THE <br /> SLURRY WALL . The plan �T'MIT= FOR MINING ALONG the perimeter by <br /> leaving AN ADEQUATE SETBACK stnpnn, adjacent to any structures = - <br /> NEEDED A graded 3h to lv SLOPE COULD BE BUILT IF NEEDED THAT t*T}' <br /> eliminates any chance that these structures will be affected by <br /> mining. This means leaving some gravel but will insure the <br /> integrity of the banks until filling is complete. MAP EXHIBIT CAND <br /> EXHIBITS contain information on all structures within 200 feet of <br /> the mined area. <br /> Site preparation will begin in Stage 1 on the southwestern part <br /> of the permit area. Once the area has been cleaned of trees, <br /> buildings and other rubbish, a slurry wall will be constructed <br /> around the area to be mined. This will serve to block ground <br /> water from entering the mining area to reduce the exposure of <br /> ground water and allow the area to be mined and backfilled as a <br /> dry site. The estimated length of the Stage 1 slurry wall will be <br /> 2270 feet and when keyed into bedrock will average 28 feet deep. <br /> THE MINING FACE WILL BE WORKED AT A NEAR VERTICAL SLOPE (%: 1) AS MINING <br /> PROGRESSES THRU THE AREA . NO MINING WILL TAKE PLACE WITHIN 200 FEET OF THE <br /> THORNTON RESERVOIR COMPLEX SLURRY WALL/DAM. THIS S SHOWN ON MAP EXHIBITS; <br /> C-1, F, AND FIGURES E-1, E-2 AND E-3 . PLEASE SEE THE ATTACHED GEOTECHNICAL <br /> EXHIBITS PREPARED BY DEERE AND AULT CONSULTANTS FOR THE MINING SETBACKS AROUND <br /> THE MINE . ALONG THE SOUTH SIDE OF STAGE 1 THE MINING SETBACK WILL BE 42 FEET. <br /> THIS ALLOWS FOR A SAFETY FACTOR OF 1 . 3 TO PROTECT STRUCTURE ALONG THE MINE <br /> PERIMETER. <br /> A Plant Site/Stockpile area will be graded on the east side of <br /> the existing lake and the access roads will be improved to <br /> facilitate hauling from the site . Once these areas are completed <br /> mining will begin on the west side of Stage 1 and all material <br /> will be hauled to the Plant Site or stockpiled on the west end of <br /> Stage 2 above the Plant Site until it can be processed. This <br /> will create a hole that will be used as a siltation pond for wash <br /> water recycling, that will last for the life of the mine . <br />