Laserfiche WebLink
RECLAMATION PLAN EXHIBIT E (cont) <br /> over the course materials, when that material is delivered some <br /> will be segregated and saved for this purpose . <br /> Initially, backfilling in Phase 1 of the Reclamation Plan will be <br /> done using on site material, mostly wash fines created during <br /> material processing and some on site rubble may also be placed in <br /> the excavated area. Phase 1 will be backfilled to a level close <br /> to its existing surface elevation and graded so it will slope <br /> gently to the west to restore the natural drainage across the <br /> site. Drainage for the existing water features that will remain <br /> will be routed around the fill area to preserve drainage. In <br /> addition to growth medium salvaged from the mine area, the finer <br /> material having been salvaged from imported material will be <br /> spread over the fill and it will be graded and seeded with the <br /> approved mix. <br /> Phase 2 will be filled with imported inert fill, as described <br /> above. Filling will begin on the east side and progress to the <br /> west as shown on the Mining Plan Map creating a gently sloping <br /> area that is at the same elevation as Monaco Street on the east <br /> side. As filling progresses across the site we will salvage and <br /> stockpile finer material to use as a final cover. It is expected <br /> that this cover will be at least 10 FEET 3 foist—deep over the <br /> courser fill of WHICH 8-12 inches of the salvage growth <br /> medium will be placed on the area for use as a seed bed. <br /> Phase 2 will slope from southeast to northwest so that stormwater <br /> can be directed to the existing lake, that will remain when <br /> mining ends. The setbacks from the property line will leave a <br /> level area around the fill that will be graded so any surface <br /> water runoff will flow to the property interior and be retained <br /> on site. This setback will allow access to the property line . <br /> When filling is complete the side slopes and setback area will be <br /> resoiled and revegetated using the approved seed mixture. The <br /> reclamation timetable shows the amount of land in each Phase when <br /> complete. <br /> The area to be revegetated will be returned to at least it ' s <br /> present vegetative condition when reclamation is complete, except <br /> in Option 2 when the Commercial Development Area where only <br /> temporary revegetation will take place. <br />