My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-12-11_PERMIT FILE - C1996083A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2014-12-11_PERMIT FILE - C1996083A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:55:57 PM
Creation date
12/16/2014 10:04:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
12/11/2014
Doc Name
Pages 2.05-1 to 2.05-83
Section_Exhibit Name
Volume I 2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 2.05.3 <br />The type of surface coal mining activities located within the 100 foot right -of- <br />way should not affect the two adjacent landowners or the public. Sediment <br />ponds and topsoil stockpiles should not be a problem to the adjacent <br />landowners or the public. The haul roads within the 100 foot right -of -way will <br />be gravel surfaced or paved and watered and cleaned as necessary to <br />control fugitive dust emissions to protect the interests of adjacent landowners <br />and the public. <br />Coal spillage from haul trucks is most often caused from overloaded or <br />uneven loading. Spillage from trucks will be promptly cleaned. <br />(vi) No stream fords are proposed for use as temporary construction routes. <br />(vii) The plans and drawings for the access roads and haul roads were prepared <br />under the direction of a professional engineer(s). <br />(4) Ponds, Impoundments and Diversions <br />(a) There will be three sediment ponds constructed for the mine facilities. The <br />• ponds are named sediment ponds B, C and D. Sediment pond D will also be <br />referred to as the refuse pile sediment pond. The loadout will have two <br />sediment ponds. The ponds are named sediment ponds J and K. <br />Sediment pond A was deleted from the design. <br />Sediment pond B was relocated below (south of) old State Highway 133 <br />during the construction of the downhill conveyor and highway coal stockpile. <br />It is designed to handle the run -off from B- Gulch. Pond B will be a typical <br />sediment pond, capable of containing the run-off from a 10 -year event with a <br />spillway system designed to handle the peak flow generated by the 25 -year <br />storm event. Dewatering will be through the primary spillway or an optional <br />centrifugal pump. <br />Sediment pond C is located above (north of) the old Bowie railroad grade and <br />is designed to handle the run -off from C- Gulch. Sediment pond C also <br />receives inflow from the mine. A small water treatment building located <br />northwest of Pond C is used to add CDPS approved chemicals to the water <br />as necessary to clarify the water. A sediment pond is to provide adequate <br />capacity-to- contain -or treat the run -off or inflow entering the pond as a result <br />of a 10 -year, 24 -hour precipitation event and any additional storage resulting <br />PR -12 2.05-37- 02/10 <br />A MOULD <br />ll1l Ell a <br />
The URL can be used to link to this page
Your browser does not support the video tag.