My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-12-15_REPORT - M1980244 (9)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-12-15_REPORT - M1980244 (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:56:00 PM
Creation date
12/16/2014 7:40:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
12/15/2014
Doc Name
Weekly CQA Report: Week ending 12/6/14.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ame,0 <br /> CRIPPLE CREEK &VICTOR GOLD MINING Co. <br /> ANGLOGOLD ASHANTI (COLORADO) <br /> SQUAW GULCH (VLF) WEEKLY REPORT <br /> Owner: Cripple Creek &Victor Gold Mining Co. Project Number: 74201125NO <br /> Project: Squaw Gulch Valley Leach Fill (VLF) Week Ending: December 6, 2014 <br /> Location: Cripple Creek &Victor Gold Mine, CO <br /> Contractor: Ames Construction, Inc. <br /> Reporting Period: 11.30.2014 through 12.6.2014 <br /> Days S I M T W I T F S <br /> D D D D D <br /> Work Shifts <br /> N N N N N <br /> D=Day Shift N=Night Shift H= Holiday <br /> Ambient Temperature Ranges During Week Weather Conditions During Week: <br /> Highs: 37°F to 45°F Cloud Cover: Partly cloudy <br /> Lows: 20°F to 29°F Precipitation: None <br /> Wind: Variable <br /> Ames: Continuing construction tasks for the Valley Leach Facility(VLF). <br /> Planning: Continuing construction activities and scheduling for the VLF. <br /> CONSTRUCTION ACTIVITIES AND PROGRESS: <br /> 1) Earthworks <br /> A) VLF (PSSA, Phase 1,and 2) <br /> Topsoil/Overburden Stripping: <br /> Topsoil was removed from the Phase 2 Area between the riprap stockpile and the Phase 2 <br /> Diversion Channel. The topsoil was hauled to the Area 34 topsoil stockpile. <br /> Tree Grubbing and Clearing,Chipping: <br /> Tree removal occurred in the Phase 2 area between the riprap stockpile and the Phase 2 <br /> Diversion Channel. Timbers greater than 6 inches in diameter were cut and stockpiled for <br /> subsequent removal. Tree stumps (root balls)and slash were hauled and piled upslope of Phase <br /> 2 Diversion Channel station 38+00. <br /> Production Drilling: None. <br /> Production Blasting: None. <br /> Structural Fill: <br /> An AMEC field professional monitored fill material temperature placed within the fill areas. <br /> Average structural fill temperatures were above 32°F. All construction materials placed were <br /> verified as suitable, and construction methods were in accordance with project technical <br /> specifications. <br /> 2014-12-6-MLE2 WEEKLY FINAL Page 1 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.