My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-11-25_GENERAL DOCUMENTS - P2013006
DRMS
>
Day Forward
>
General Documents
>
Prospect
>
P2013006
>
2014-11-25_GENERAL DOCUMENTS - P2013006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:55:36 PM
Creation date
12/12/2014 7:49:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2013006
IBM Index Class Name
General Documents
Doc Date
11/25/2014
Doc Name
Updated Reclamation Cost Packet
From
DRMS
To
Fortune Revenue Silver Mines
Permit Index Doc Type
General Correspondence
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Loader Worksheet Cont'd Task#02A Page 2 of 2 <br /> Total Travel Time: 0.0571 minutes <br /> Total Cycle Time: 0.6421 minutes <br /> Load Bucket Capacity <br /> Rated Capacity: 2.70 LCY(heaped) <br /> Bucket Fill Factor: 0.900 Other-soil,boulders,roots(80-100%)0.900 <br /> Adjusted Capacity: 2.43 LCY <br /> Job Condition Correction Factors <br /> Site Altitude: 11500 feet <br /> Source <br /> Altitude Adj: 0.97 _(CAT HB) <br /> Job Efficiency: _ 0.83 (1 shift/day) <br /> Net Correction: 0.81 multiplier <br /> Unadjusted Hourly Unit Production: 227.08 LCY/Hour <br /> Adjusted Hourly Unit Production: 182.82 LCY/Hour <br /> Adjusted Hourly Fleet Production: 182.82 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Loader(s) Total job time: 1.16 Hours <br /> Unit cost: $0.434 /LCY Total job cost: S92 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.