Laserfiche WebLink
Loader Worksheet Cont'd Task#02A Page 2 of 2 <br /> Total Travel Time: 0.0571 minutes <br /> Total Cycle Time: 0.6421 minutes <br /> Load Bucket Capacity <br /> Rated Capacity: 2.70 LCY(heaped) <br /> Bucket Fill Factor: 0.900 Other-soil,boulders,roots(80-100%)0.900 <br /> Adjusted Capacity: 2.43 LCY <br /> Job Condition Correction Factors <br /> Site Altitude: 11500 feet <br /> Source <br /> Altitude Adj: 0.97 _(CAT HB) <br /> Job Efficiency: _ 0.83 (1 shift/day) <br /> Net Correction: 0.81 multiplier <br /> Unadjusted Hourly Unit Production: 227.08 LCY/Hour <br /> Adjusted Hourly Unit Production: 182.82 LCY/Hour <br /> Adjusted Hourly Fleet Production: 182.82 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Loader(s) Total job time: 1.16 Hours <br /> Unit cost: $0.434 /LCY Total job cost: S92 <br /> CIRCES Cost Estimating Software <br />